PLANNING SUPPORTING DOCUMENTS

Planning documents,
organised by professional.

Reports, statements, surveys, forms and supporting evidence for householder, residential and mixed-use development, from small proposals to major schemes.

Architectural drawing packages are excluded from this register. Specialist technical plans, such as tree protection plans, are included where they form planning supporting evidence.

Proportionate to your project

Not every document is needed for every application. We identify the relevant reports from the proposal, site constraints and the council’s current requirements.

The right document at the right stage

Some information supports validation, some supports the planning decision, and some is submitted to discharge conditions after permission. We confirm the stage in your document schedule.

One coordinated scope

Related assessments may be combined into one report. The list describes potential supporting documents; your fee proposal confirms the deliverables and specialist appointments.

USING THE DOCUMENT REGISTER

Choose evidence around the proposal.

  1. 1
    The applicationIts type and the description of development
  2. 2
    The site and the changesConstraints and what the proposal alters
  3. 3
    Local requirementsThe council’s checklist, correspondence and specialist advice

This register is a guide to the breadth of planning supporting documentation. It is not a checklist requiring every document for every application. A householder alteration, a small housing scheme and a major mixed-use development can have very different evidence needs.

Start with the application type and description, then consider the site constraints and proposed changes. The relevant local submission requirements, council correspondence and specialist advice help identify which items need to be prepared.

Householder proposals

Focus on the information needed to explain the alteration and its effects. Depending on the site, supporting evidence may address design, heritage, trees, flood risk or neighbouring amenity.

Small and medium residential schemes

Consider the planning case alongside access, servicing, amenity and relevant environmental constraints. Identify specialist surveys early so that the design can respond to the findings.

Major and mixed-use development

Establish a coordinated evidence schedule covering the proposed uses, scale and principal impacts. Agree dependencies between disciplines and track the design version used for each assessment.

PREPARING A COHERENT PACKAGE

Make each document usable.

Example document control

RevPurposeDrawings
P01Draft for team commentRev A
P02Updated to design changesRev B
C01Issued for submissionRev C

Every report records its revision and the drawings it relies on.

A specialist consultant report should identify the project, proposal, assessment scope and evidence used. It should distinguish observations from assumptions, explain the findings and set out recommendations that the project team can follow.

  • Use a consistent site address and development description.
  • Record document references, dates and revisions.
  • Identify the drawings and specialist information relied upon.
  • Explain information gaps and assessment limitations.
  • Check that recommendations agree with the proposed design.
  • Track documents for submission separately from later condition evidence.

The service pages show illustrative front covers, contents pages and written section guidance. Architectural drawing packages are outside this supporting-document register.

288 documents across 30 professional groups

Choose a report type or the professional consultant who would typically lead preparation or coordination. You can combine the selectors with a keyword or document subject. Some reports need several specialists; the final responsibilities and scope are agreed for your project. Architectural drawings are excluded.

Acoustic & vibration consultants7 documents
  • I09

    Acoustic Design Statement

    Acoustic compatibility of uses

    Subject: Amenity, daylight & environmental impacts

  • M05

    Construction Noise and Vibration Assessment

    Noise and vibration during works

    Subject: Construction, demolition & logistics

  • N17

    Noise and Acoustic Separation Assessment

    Commercial uses adjoining housing

    Subject: Commercial & mixed-use operations

  • I08

    Noise Impact Assessment

    Road, rail, industrial or operational noise

    Subject: Amenity, daylight & environmental impacts

  • N19

    Plant and Ventilation Noise Assessment

    Mechanical services

    Subject: Commercial & mixed-use operations

  • I10

    Plant Noise Assessment

    Mechanical equipment noise

    Subject: Amenity, daylight & environmental impacts

  • I11

    Vibration Assessment

    Rail, plant or construction vibration

    Subject: Amenity, daylight & environmental impacts

Air quality & odour consultants4 documents
  • I12

    Air Quality Assessment

    Emissions and exposure

    Subject: Amenity, daylight & environmental impacts

  • I13

    Air Quality Neutral / Positive Assessment

    Where required by London policy

    Subject: Amenity, daylight & environmental impacts

  • M04

    Construction Dust Management Plan

    Dust emissions and mitigation

    Subject: Construction, demolition & logistics

  • I14

    Odour Impact Assessment

    Commercial kitchens, waste or industrial uses

    Subject: Amenity, daylight & environmental impacts

    Other input may include: Building services engineers.

Arboricultural consultants6 documents
  • E02

    Arboricultural Impact Assessment

    Development effects on trees

    Subject: Trees, ecology & biodiversity

  • E05

    Arboricultural Method Statement

    Works near retained trees

    Subject: Trees, ecology & biodiversity

  • E01

    Arboricultural Survey

    Trees on or affecting the site

    Subject: Trees, ecology & biodiversity

  • E03

    Tree Constraints Plan

    Root protection areas and constraints

    Subject: Trees, ecology & biodiversity

  • E04

    Tree Protection Plan

    Retained-tree protection

    Subject: Trees, ecology & biodiversity

  • E06

    Tree Removal and Replacement Schedule

    Loss and replacement planting

    Subject: Trees, ecology & biodiversity

Archaeologists4 documents
  • D08

    Archaeological Desk-Based Assessment

    Archaeological potential

    Subject: Heritage, conservation & archaeology

  • D09

    Archaeological Evaluation / Trial Trenching

    Where required by archaeological advice

    Subject: Heritage, conservation & archaeology

  • D16

    Archaeological Mitigation Strategy

    Preservation or recording measures

    Subject: Heritage, conservation & archaeology

  • D10

    Archaeological Written Scheme of Investigation

    Proposed archaeological investigation

    Subject: Heritage, conservation & archaeology

Building services engineers6 documents
  • J15

    District Heat Network Feasibility Assessment

    Connection requirements

    Subject: Energy, carbon & sustainability

  • J24

    Future Energy Infrastructure Strategy

    Energy infrastructure allowance

    Subject: Energy, carbon & sustainability

  • J14

    Heating and Cooling Strategy

    Heat networks, plant and cooling

    Subject: Energy, carbon & sustainability

  • I15

    Kitchen Extract Assessment

    Food and beverage uses

    Subject: Amenity, daylight & environmental impacts

    Other input may include: Air quality and odour consultants; Acoustic consultants.

  • N18

    Odour and Kitchen Extract Strategy

    Food preparation uses

    Subject: Commercial & mixed-use operations

    Other input may include: Air quality and odour consultants; Acoustic consultants.

  • I16

    Ventilation Strategy

    Air quality and acoustic constraints

    Subject: Amenity, daylight & environmental impacts

Civil & drainage engineers and surveyors13 documents
  • F10

    CCTV Drainage Survey

    Where underground drainage condition is material

    Subject: Flood risk, drainage & water

  • M14

    Construction Drainage / Pollution Prevention Plan

    Construction water and pollution controls

    Subject: Construction, demolition & logistics

    Other input may include: Construction team; Environmental specialists.

  • F11

    Drainage Capacity / Network Assessment

    Capacity and discharge constraints

    Subject: Flood risk, drainage & water

  • F19

    Drainage Maintenance / Management Plan

    Long-term SuDS and drainage maintenance

    Subject: Flood risk, drainage & water

    Other input may include: Estate management team.

  • F09

    Existing Drainage Survey

    Existing drainage network and outfalls

    Subject: Flood risk, drainage & water

  • L04

    Firefighting Water Supply Assessment

    Hydrant and supply considerations

    Subject: Planning fire safety, access & security

    Other input may include: Fire safety engineers; Water supplier.

  • F08

    Foul Drainage Strategy

    Foul wastewater disposal

    Subject: Flood risk, drainage & water

  • F12

    Infiltration Testing Report

    Infiltration-based SuDS feasibility

    Subject: Flood risk, drainage & water

    Other input may include: Geotechnical specialists.

  • F04

    Surface Water Drainage Strategy

    Surface water runoff management

    Subject: Flood risk, drainage & water

  • F06

    Surface Water Runoff Calculations

    Existing and proposed runoff rates

    Subject: Flood risk, drainage & water

  • F05

    Sustainable Drainage Systems (SuDS) Strategy

    Drainage hierarchy and sustainable measures

    Subject: Flood risk, drainage & water

  • F22

    Thames Water / Sewer Undertaker Consultation Evidence

    Where asset protection or network constraints apply

    Subject: Flood risk, drainage & water

    Other input may include: Sewer undertaker.

  • F18

    Water Supply Capacity / Infrastructure Statement

    Water infrastructure impacts

    Subject: Flood risk, drainage & water

Construction & environmental management specialists5 documents
  • M03

    Construction Environmental Management Plan

    Environmental controls

    Subject: Construction, demolition & logistics

    Other input may include: Relevant environmental specialists; Construction team.

  • M01

    Construction Management Plan

    Construction impacts and management

    Subject: Construction, demolition & logistics

  • M09

    Construction Phasing Plan

    Construction sequence

    Subject: Construction, demolition & logistics

  • M15

    Construction Working Hours Statement

    Where planning management is necessary

    Subject: Construction, demolition & logistics

  • M06

    Demolition Management Plan

    Demolition process and impacts

    Subject: Construction, demolition & logistics

Daylight & sunlight specialists4 documents
  • I01

    Daylight and Sunlight Assessment

    Impact on neighbouring and proposed accommodation

    Subject: Amenity, daylight & environmental impacts

  • I06

    Internal Daylight Assessment

    Proposed dwelling daylight conditions

    Subject: Amenity, daylight & environmental impacts

  • I07

    Internal Sunlight Assessment

    Sunlight to proposed accommodation

    Subject: Amenity, daylight & environmental impacts

  • I02

    Overshadowing Assessment

    Effects on gardens, amenity and open spaces

    Subject: Amenity, daylight & environmental impacts

Design & inclusive access specialists19 documents
  • C14

    Accessibility / Inclusive Design Statement

    Accessible and adaptable accommodation

    Subject: Planning, design & policy statements

    Other input may include: Design team; Access specialists.

  • K08

    Accessible Housing Compliance Statement

    Accessible/adaptable residential accommodation

    Subject: Housing, accommodation & viability

  • C02

    Design and Access Statement

    Design rationale and accessibility

    Subject: Planning, design & policy statements

    Other input may include: Planning consultants; Design team.

  • O06

    Design Code

    Strategic or phased development

    Subject: Major development & strategic assessments

  • C16

    Design Code Compliance Statement

    Where an adopted code applies

    Subject: Planning, design & policy statements

  • C03

    Design Statement

    Smaller projects where a full DAS is unnecessary

    Subject: Planning, design & policy statements

  • N02

    Existing and Proposed Land-use Schedule

    Floorspace by use

    Subject: Commercial & mixed-use operations

  • K16

    HMO Occupancy and Accommodation Schedule

    Room sizes, kitchens, bathrooms and occupancy

    Subject: Housing, accommodation & viability

  • L07

    Inclusive Access Statement

    Access for disabled and other users

    Subject: Planning fire safety, access & security

    Other input may include: Design team.

  • K09

    Internal Space Standards Assessment

    Dwelling space standard compliance

    Subject: Housing, accommodation & viability

  • O04

    Masterplan Design and Access Statement

    Large-scale coordinated design

    Subject: Major development & strategic assessments

  • I22

    Outdoor Amenity Quality Assessment

    Quality of balconies and shared amenity

    Subject: Amenity, daylight & environmental impacts

  • I05

    Outlook Assessment

    Residential outlook quality

    Subject: Amenity, daylight & environmental impacts

  • I04

    Privacy / Overlooking Assessment

    Potential overlooking and privacy loss

    Subject: Amenity, daylight & environmental impacts

  • K10

    Private and Communal Amenity Schedule

    Outdoor amenity provision

    Subject: Housing, accommodation & viability

  • K01

    Residential Accommodation Schedule

    Unit number, tenure, bedroom mix and floor area

    Subject: Housing, accommodation & viability

  • N20

    Residential and Commercial Access Strategy

    Independent or shared entrances

    Subject: Commercial & mixed-use operations

  • K12

    Residential Quality Assessment

    Overall residential quality

    Subject: Housing, accommodation & viability

  • C12

    Space Standards Compliance Schedule

    Internal residential space standards

    Subject: Planning, design & policy statements

Ecologists & biodiversity specialists20 documents
  • E13

    Badger Survey

    Presence or potential disturbance

    Subject: Trees, ecology & biodiversity

  • E09

    Bat Activity / Emergence Survey

    Where further bat surveys are necessary

    Subject: Trees, ecology & biodiversity

  • E25

    Biodiversity / Ecological Lighting Assessment

    Effects of external lighting on species

    Subject: Trees, ecology & biodiversity

    Other input may include: Lighting specialists.

  • E18

    Biodiversity Gain Strategy / Draft BNG Plan

    Proposed delivery of biodiversity improvements

    Subject: Trees, ecology & biodiversity

    Other input may include: Landscape architects; Planning consultants.

  • E16

    Biodiversity Net Gain Baseline Assessment

    Where statutory BNG applies

    Subject: Trees, ecology & biodiversity

  • E26

    BNG Exemption Justification

    Where a relevant exemption is claimed

    Subject: Trees, ecology & biodiversity

    Other input may include: Planning consultants.

  • E10

    Breeding Bird Assessment

    Potential impacts on nesting birds

    Subject: Trees, ecology & biodiversity

  • E24

    Construction Ecological Management Plan

    Ecological controls during works

    Subject: Trees, ecology & biodiversity

    Other input may include: Construction management team.

  • E20

    Ecological Impact Assessment

    Significant ecological effects

    Subject: Trees, ecology & biodiversity

  • E22

    Ecological Mitigation and Enhancement Plan

    Protection and biodiversity enhancements

    Subject: Trees, ecology & biodiversity

  • E12

    Great Crested Newt Assessment

    Relevant habitat and protected-species considerations

    Subject: Trees, ecology & biodiversity

  • E19

    Habitat Management and Monitoring Plan

    Required habitat management and monitoring

    Subject: Trees, ecology & biodiversity

    Other input may include: Landscape architects; Site management team.

  • E15

    Habitat Survey and Mapping

    Habitat extent and characteristics

    Subject: Trees, ecology & biodiversity

  • E21

    Habitats Regulations Assessment Information

    Potential effects on protected European sites

    Subject: Trees, ecology & biodiversity

  • E23

    Landscape and Ecological Management Plan

    Long-term habitat management

    Subject: Trees, ecology & biodiversity

    Other input may include: Landscape architects; Estate management team.

  • E14

    Other Protected Species Surveys

    Species-specific site requirements

    Subject: Trees, ecology & biodiversity

  • E07

    Preliminary Ecological Appraisal

    Site ecological constraints

    Subject: Trees, ecology & biodiversity

  • E08

    Preliminary Roost Assessment

    Bat roost potential

    Subject: Trees, ecology & biodiversity

  • E11

    Reptile Survey

    Suitable habitat and potential impacts

    Subject: Trees, ecology & biodiversity

  • E17

    Statutory Biodiversity Metric Calculation

    Where statutory BNG applies

    Subject: Trees, ecology & biodiversity

EIA coordinators & environmental consultants7 documents
  • O08

    Cumulative Impact Assessment

    Other planned or committed development

    Subject: Major development & strategic assessments

    Other input may include: Relevant technical specialists.

  • A14

    EIA Scoping Opinion

    Where a scoping opinion is sought

    Subject: Application forms, certificates & submission records

    The formal opinion is issued by the planning authority or relevant decision-maker. The EIA coordinator or planning consultant prepares the request and supporting information.

  • A13

    EIA Screening Opinion

    Where the development potentially requires EIA

    Subject: Application forms, certificates & submission records

    The formal opinion is issued by the planning authority or relevant decision-maker. The EIA coordinator or planning consultant prepares the request and supporting information.

  • O02

    Environmental Impact Assessment Non-technical Summary

    Where an Environmental Statement is required

    Subject: Major development & strategic assessments

  • A15

    Environmental Statement

    Where EIA is mandatory

    Subject: Application forms, certificates & submission records

  • O01

    Environmental Statement

    EIA development

    Subject: Major development & strategic assessments

  • O03

    Environmental Statement Technical Appendices

    Supporting technical evidence

    Subject: Major development & strategic assessments

Energy, carbon & sustainability consultants24 documents
  • J16

    BREEAM Pre-assessment

    Where the relevant assessment standard is required

    Subject: Energy, carbon & sustainability

    Other input may include: BREEAM assessors.

  • J07

    Circular Economy Statement

    Where London or local policy requires

    Subject: Energy, carbon & sustainability

  • O28

    Circular Economy Statement

    Where applicable

    Subject: Major development & strategic assessments

  • J21

    Circular Materials / Reuse Assessment

    Retention and material reuse

    Subject: Energy, carbon & sustainability

  • J23

    Climate Change Adaptation Statement

    Heat, flood and resilience considerations

    Subject: Energy, carbon & sustainability

  • J22

    Demolition Versus Retention Carbon Assessment

    Justification for substantial demolition

    Subject: Energy, carbon & sustainability

  • J11

    Dynamic Thermal Modelling

    Detailed thermal performance

    Subject: Energy, carbon & sustainability

  • J09

    Embodied Carbon Assessment

    Carbon from construction and materials

    Subject: Energy, carbon & sustainability

  • J03

    Energy Hierarchy Assessment

    Energy demand, efficiency and clean energy

    Subject: Energy, carbon & sustainability

  • J01

    Energy Statement

    Operational energy and emissions

    Subject: Energy, carbon & sustainability

  • J25

    Net Zero Carbon Strategy

    Where specific adopted policies require it

    Subject: Energy, carbon & sustainability

  • J08

    Operational Carbon Assessment

    Operational carbon performance

    Subject: Energy, carbon & sustainability

  • J10

    Overheating Assessment

    Risks from high temperatures

    Subject: Energy, carbon & sustainability

  • J12

    Passive Design Assessment

    Passive design and climate response

    Subject: Energy, carbon & sustainability

  • J13

    Renewable Energy Feasibility Assessment

    Solar PV, heat pumps and other renewable systems

    Subject: Energy, carbon & sustainability

  • J04

    SAP / Dwelling Energy Assessment

    Where supporting residential energy compliance

    Subject: Energy, carbon & sustainability

  • J05

    SBEM / Non-domestic Energy Assessment

    Commercial energy performance

    Subject: Energy, carbon & sustainability

  • J02

    Sustainability Statement

    Wider sustainable design

    Subject: Energy, carbon & sustainability

    Other input may include: Relevant technical specialists; Design team.

  • J18

    Sustainable Construction Statement

    Materials and construction methods

    Subject: Energy, carbon & sustainability

  • I20

    Urban Heat / Overheating Assessment

    Overheating and climate adaptation

    Subject: Amenity, daylight & environmental impacts

  • J17

    Water Efficiency Assessment

    Water consumption targets

    Subject: Energy, carbon & sustainability

  • F17

    Water Efficiency Statement

    Water consumption and conservation

    Subject: Flood risk, drainage & water

  • J06

    Whole Life-Cycle Carbon Assessment

    Where London or local policy requires

    Subject: Energy, carbon & sustainability

  • O27

    Whole Life-Cycle Carbon Assessment

    Where applicable

    Subject: Major development & strategic assessments

Fire safety engineers6 documents
  • L05

    Fire Evacuation Design Statement

    Where appropriate at planning stage

    Subject: Planning fire safety, access & security

  • L06

    Fire Safety Design Considerations

    Fire safety integration into site design

    Subject: Planning fire safety, access & security

  • N21

    Fire Safety Interface Statement

    Residential/commercial interface

    Subject: Commercial & mixed-use operations

    Other input may include: Building services engineers; Design team.

  • O34

    Fire Safety Masterplan

    Integrated fire-safety-related site planning

    Subject: Major development & strategic assessments

    Other input may include: Design team; Transport consultants.

  • L02

    Planning Fire Safety Strategy

    Fire safety policies and site planning

    Subject: Planning fire safety, access & security

  • L01

    Statutory Planning Fire Statement

    Gateway One relevant-building applications

    Subject: Planning fire safety, access & security

    Other input may include: Design team; Planning consultants.

Flood risk consultants & hydrogeologists11 documents
  • F15

    Basement Flood Risk Assessment

    Basement flood exposure

    Subject: Flood risk, drainage & water

    Other input may include: Structural engineers; Drainage engineers.

  • F16

    Flood Evacuation / Emergency Plan

    Where residual flood risk requires management

    Subject: Flood risk, drainage & water

  • F01

    Flood Risk Assessment

    Flood-risk location or applicable development triggers

    Subject: Flood risk, drainage & water

  • F03

    Flood Risk Exception Test Evidence

    Where the Exception Test applies

    Subject: Flood risk, drainage & water

    Other input may include: Planning consultants; Design team.

  • F02

    Flood Risk Sequential Test

    Where policy requires alternative-site consideration

    Subject: Flood risk, drainage & water

    Other input may include: Planning consultants.

  • F13

    Groundwater Assessment

    Groundwater impacts

    Subject: Flood risk, drainage & water

  • G11

    Groundwater Impact Assessment

    Excavation and groundwater effects

    Subject: Ground conditions, stability & basements

    Other input may include: Geotechnical specialists; Structural engineers.

  • F14

    Groundwater Monitoring Report

    Basements and sensitive groundwater conditions

    Subject: Flood risk, drainage & water

  • F20

    Ordinary Watercourse / Culvert Assessment

    Works affecting watercourses

    Subject: Flood risk, drainage & water

  • O31

    Strategic Flood Risk / Drainage Strategy

    Strategic water management

    Subject: Major development & strategic assessments

    Other input may include: Drainage engineers; Planning consultants.

  • F21

    Water Quality / Pollution Prevention Assessment

    Potential impacts on receiving waters

    Subject: Flood risk, drainage & water

Geotechnical & geo-environmental specialists13 documents
  • G05

    Basement Impact Assessment

    Basement development and neighbour impacts

    Subject: Ground conditions, stability & basements

    Other input may include: Structural engineers; Hydrogeologists; Drainage engineers.

  • G20

    Coal Mining / Mining Risk Assessment

    Sites in relevant mining areas

    Subject: Ground conditions, stability & basements

    Other input may include: Mining risk specialists.

  • G16

    Foundation Impact Assessment

    Where foundations influence planning impacts

    Subject: Ground conditions, stability & basements

  • G03

    Geo-environmental Assessment

    Ground contamination and environmental constraints

    Subject: Ground conditions, stability & basements

  • G04

    Geotechnical Investigation Report

    Ground engineering characteristics

    Subject: Ground conditions, stability & basements

  • G07

    Ground Movement Assessment

    Predicted ground movement

    Subject: Ground conditions, stability & basements

    Other input may include: Structural engineers.

  • G13

    Land Contamination Remediation Strategy

    Remediation of identified contamination

    Subject: Ground conditions, stability & basements

  • G14

    Landfill Gas / Ground Gas Assessment

    Potential ground-gas exposure

    Subject: Ground conditions, stability & basements

  • G01

    Phase 1 Preliminary Risk Assessment

    Potential contaminated land

    Subject: Ground conditions, stability & basements

  • G02

    Phase 2 Ground Investigation Report

    Intrusive investigation where necessary

    Subject: Ground conditions, stability & basements

  • G22

    Piling Risk Assessment

    Groundwater, contamination or infrastructure risks

    Subject: Ground conditions, stability & basements

    Other input may include: Structural engineers; Hydrogeologists.

  • G15

    Slope Stability Assessment

    Sloping and unstable terrain

    Subject: Ground conditions, stability & basements

  • G12

    Subsidence / Stability Assessment

    Known or suspected ground instability

    Subject: Ground conditions, stability & basements

Heritage & conservation consultants11 documents
  • D03

    Conservation Area Appraisal / Impact Statement

    Conservation area character and appearance

    Subject: Heritage, conservation & archaeology

  • D13

    Conservation Method Statement

    Sensitive conservation and repair works

    Subject: Heritage, conservation & archaeology

    Other input may include: Conservation contractors; Design team.

  • D02

    Heritage Impact Assessment

    Detailed assessment of heritage effects

    Subject: Heritage, conservation & archaeology

  • D15

    Heritage Justification for Demolition

    Demolition affecting heritage assets

    Subject: Heritage, conservation & archaeology

  • D05

    Heritage Setting Assessment

    Effects on the setting of heritage assets

    Subject: Heritage, conservation & archaeology

  • D01

    Heritage Statement

    Effects on heritage significance

    Subject: Heritage, conservation & archaeology

  • D06

    Historic Building Assessment

    Significance and fabric appraisal

    Subject: Heritage, conservation & archaeology

  • D07

    Historic Building Recording / Photographic Survey

    Existing historic condition

    Subject: Heritage, conservation & archaeology

  • D14

    Historic Fabric / Material Schedule

    Repair and replacement specifications

    Subject: Heritage, conservation & archaeology

  • D04

    Listed Building Impact Assessment

    Works to or affecting a listed building

    Subject: Heritage, conservation & archaeology

  • D12

    Significance / Harm / Public Benefits Assessment

    Where heritage harm is identified

    Subject: Heritage, conservation & archaeology

Landscape architects7 documents
  • K11

    Children's Play Space Assessment

    Child yield and play space

    Subject: Housing, accommodation & viability

    Other input may include: Design team; Play space specialists.

  • J19

    Green Roof / Living Roof Strategy

    Green infrastructure

    Subject: Energy, carbon & sustainability

    Other input may include: Ecologists; Drainage engineers; Structural engineers.

  • O18

    Open Space and Play Strategy

    Open space and play provision

    Subject: Major development & strategic assessments

    Other input may include: Ecologists; Play space specialists.

  • C15

    Open Space Assessment

    Provision or loss of open space

    Subject: Planning, design & policy statements

  • O19

    Public Realm Strategy

    Public realm improvements

    Subject: Major development & strategic assessments

    Other input may include: Transport consultants; Inclusive access specialists.

  • J20

    Urban Greening Factor Assessment

    Applicable London urban-greening policies

    Subject: Energy, carbon & sustainability

    Other input may include: Ecologists; Design team.

  • O29

    Urban Greening Factor Assessment

    Where applicable

    Subject: Major development & strategic assessments

    Other input may include: Ecologists; Design team.

Lighting, wind & microclimate specialists4 documents
  • I17

    External Lighting Assessment

    Light spill and neighbouring amenity

    Subject: Amenity, daylight & environmental impacts

  • I21

    Glint and Glare Assessment

    Reflective façades or solar installations

    Subject: Amenity, daylight & environmental impacts

    Other input may include: Glint and glare specialists.

  • I18

    Light Pollution Assessment

    Sensitive residential or ecological receptors

    Subject: Amenity, daylight & environmental impacts

  • I19

    Wind Microclimate Assessment

    Tall or exposed buildings

    Subject: Amenity, daylight & environmental impacts

    Other input may include: Wind engineering specialists.

Operational & estate management specialists7 documents
  • K17

    Build to Rent Management Statement

    Build-to-rent proposals

    Subject: Housing, accommodation & viability

  • N14

    Business Opening Hours Statement

    Operating hours and neighbouring amenity

    Subject: Commercial & mixed-use operations

  • K18

    Co-living Operational Statement

    Large-scale shared living

    Subject: Housing, accommodation & viability

  • N23

    Community Use / Management Agreement

    Shared or community facilities

    Subject: Commercial & mixed-use operations

  • K15

    HMO Management Plan

    HMO or sui generis accommodation

    Subject: Housing, accommodation & viability

    Other input may include: Property operator; Planning consultants.

  • O21

    Long-term Estate Management Strategy

    Management and maintenance

    Subject: Major development & strategic assessments

  • N13

    Operational Management Plan

    Mixed-use operating arrangements

    Subject: Commercial & mixed-use operations

Planning consultants38 documents
  • O23

    Affordable Housing Delivery Strategy

    Tenure distribution and delivery

    Subject: Major development & strategic assessments

  • K03

    Affordable Housing Statement

    Applicable affordable-housing policy

    Subject: Housing, accommodation & viability

  • K04

    Affordable Housing Tenure Schedule

    Affordable rent, intermediate and other tenure

    Subject: Housing, accommodation & viability

  • I24

    Agent of Change Assessment

    Protection of existing noise-generating uses

    Subject: Amenity, daylight & environmental impacts

  • N26

    Agent of Change Assessment

    Conflicts between sensitive and active uses

    Subject: Commercial & mixed-use operations

    Other input may include: Acoustic consultants; Design team.

  • C18

    Alternative Site / Sequential Assessment

    Where planning policy requires site alternatives

    Subject: Planning, design & policy statements

    Other input may include: Flood risk or retail specialists, as relevant.

  • N03

    Commercial Floorspace Assessment

    Existing and proposed commercial floorspace

    Subject: Commercial & mixed-use operations

  • O26

    Community Infrastructure Levy Assessment

    Applicable infrastructure levy

    Subject: Major development & strategic assessments

  • C06

    Consultation Statement

    Summary of feedback and design responses

    Subject: Planning, design & policy statements

  • K20

    Existing Housing Loss Assessment

    Loss or reconfiguration of existing dwellings

    Subject: Housing, accommodation & viability

  • C07

    Existing Use Assessment

    Demonstrate established existing uses

    Subject: Planning, design & policy statements

  • O35

    GLA Referral and Supporting Evidence Pack

    Mayor-referable applications in London

    Subject: Major development & strategic assessments

    Other input may include: Relevant technical specialists.

  • K19

    Housing Delivery / Phasing Statement

    Large multi-phase housing schemes

    Subject: Housing, accommodation & viability

  • C11

    Housing Mix Statement

    Unit types, sizes and tenures

    Subject: Planning, design & policy statements

  • K02

    Housing Mix Statement

    Appropriate dwelling types and sizes

    Subject: Housing, accommodation & viability

  • C09

    Housing Need Statement

    Where local housing need is material

    Subject: Planning, design & policy statements

  • I23

    Industrial / Commercial Compatibility Assessment

    Residential development beside commercial uses

    Subject: Amenity, daylight & environmental impacts

  • O09

    Infrastructure Delivery Plan / Statement

    Supporting infrastructure

    Subject: Major development & strategic assessments

    Other input may include: Utilities engineers; Transport consultants; Delivery team.

  • C08

    Land-use Justification Statement

    Changes of use and mixed-use redevelopment

    Subject: Planning, design & policy statements

  • N07

    Loss of Employment / Commercial Space Assessment

    Loss of protected employment or commercial uses

    Subject: Commercial & mixed-use operations

  • N01

    Mixed-use Planning Statement

    Compatibility and policy justification

    Subject: Commercial & mixed-use operations

  • K14

    Older Persons / Specialist Housing Statement

    Specialist housing proposals

    Subject: Housing, accommodation & viability

  • O22

    Phasing and Implementation Strategy

    Delivery programme

    Subject: Major development & strategic assessments

    Other input may include: Development and delivery team.

  • C19

    Planning Balance / Very Special Circumstances Statement

    Green Belt or other exceptional policy cases

    Subject: Planning, design & policy statements

  • A17

    Planning performance agreement documentation

    For applications using a PPA

    Subject: Application forms, certificates & submission records

  • C04

    Planning Policy Compliance Matrix

    Structured review of applicable policies

    Subject: Planning, design & policy statements

  • C01

    Planning Statement

    Justification against national and local policies

    Subject: Planning, design & policy statements

  • A12

    Pre-application response compliance schedule

    Record responses to council advice

    Subject: Application forms, certificates & submission records

  • C13

    Residential Amenity Statement

    Privacy, outlook, outdoor space and amenity

    Subject: Planning, design & policy statements

  • C10

    Residential Density Assessment

    Density and site-capacity justification

    Subject: Planning, design & policy statements

  • N04

    Retail Impact Assessment

    Qualifying retail or leisure development

    Subject: Commercial & mixed-use operations

  • C20

    Retrospective Planning Justification

    Where permission is sought after works have occurred

    Subject: Planning, design & policy statements

  • C05

    Statement of Community Involvement

    Public engagement where required

    Subject: Planning, design & policy statements

  • O11

    Statement of Community Involvement

    Community consultation

    Subject: Major development & strategic assessments

  • K13

    Student Accommodation Needs Assessment

    Purpose-built student accommodation

    Subject: Housing, accommodation & viability

  • A18

    Supporting validation explanation

    To justify non-submission of a conditionally requested report

    Subject: Application forms, certificates & submission records

  • C17

    Tall Buildings Statement

    Policy justification for tall buildings

    Subject: Planning, design & policy statements

    Other input may include: Townscape specialists; Design team.

  • N05

    Town Centre Sequential Assessment

    Where national/local town-centre policy requires

    Subject: Commercial & mixed-use operations

Planning obligations & legal advisers2 documents
  • A16

    Draft planning obligations / S106 heads of terms

    Where obligations are proposed

    Subject: Application forms, certificates & submission records

  • O25

    S106 Planning Obligations Draft Heads of Terms

    Contributions, infrastructure and mitigation

    Subject: Major development & strategic assessments

    Other input may include: Planning consultants; Development team.

Safety & security consultants3 documents
  • L09

    Operational Safety Assessment

    Unusual uses or major hazards

    Subject: Planning fire safety, access & security

  • L10

    Safety and Security Management Plan

    Relevant mixed-use or specialist development

    Subject: Planning fire safety, access & security

  • L08

    Security / Secured by Design Statement

    Crime prevention and environmental design

    Subject: Planning fire safety, access & security

Socio-economic, health & infrastructure specialists13 documents
  • N06

    Commercial Need and Demand Assessment

    Where viability or policy requires justification

    Subject: Commercial & mixed-use operations

  • N11

    Community Facility Needs Assessment

    Community facilities or replacement provision

    Subject: Commercial & mixed-use operations

  • N12

    Community Infrastructure Assessment

    Pressure on local facilities

    Subject: Commercial & mixed-use operations

  • O16

    Education Capacity / School Places Assessment

    Population growth implications

    Subject: Major development & strategic assessments

  • N08

    Employment and Economic Impact Assessment

    Job creation and economic effects

    Subject: Commercial & mixed-use operations

  • O12

    Equality Impact Assessment

    Where relevant to proposed planning decisions

    Subject: Major development & strategic assessments

  • N24

    Health Impact Assessment

    Where the nature or scale warrants it

    Subject: Commercial & mixed-use operations

  • O13

    Health Impact Assessment

    Population health impacts

    Subject: Major development & strategic assessments

  • O17

    Healthcare Capacity Assessment

    Effects on healthcare infrastructure

    Subject: Major development & strategic assessments

  • N10

    Healthcare Needs Assessment

    Medical and healthcare developments

    Subject: Commercial & mixed-use operations

  • N25

    Social Infrastructure Delivery Strategy

    Major mixed-use development

    Subject: Commercial & mixed-use operations

  • O14

    Social Value / Local Employment Strategy

    Where applicable policies require

    Subject: Major development & strategic assessments

  • O15

    Socio-economic Impact Assessment

    Employment, services and local economy

    Subject: Major development & strategic assessments

Structural engineers8 documents
  • G17

    Adjacent Structure Impact Assessment

    Impacts on neighbouring structures

    Subject: Ground conditions, stability & basements

  • G06

    Basement Construction Method Statement

    Proposed methodology where planning policy requires

    Subject: Ground conditions, stability & basements

    Other input may include: Geotechnical specialists; Construction team.

  • G18

    Construction Vibration / Settlement Assessment

    Potential effects from excavation and works

    Subject: Ground conditions, stability & basements

    Other input may include: Geotechnical specialists; Acoustic consultants.

  • M08

    Excavation and Earthworks Strategy

    Major excavation

    Subject: Construction, demolition & logistics

    Other input may include: Geotechnical specialists; Construction team.

  • G09

    Existing Building Structural Assessment

    Effects of alteration or redevelopment

    Subject: Ground conditions, stability & basements

  • M13

    Neighbouring Building Protection Strategy

    Sensitive adjacent buildings

    Subject: Construction, demolition & logistics

    Other input may include: Construction team; Geotechnical specialists.

  • G10

    Retaining Wall Impact Assessment

    Proposed retaining works

    Subject: Ground conditions, stability & basements

  • G08

    Structural Feasibility Statement

    Structural practicability of proposed works

    Subject: Ground conditions, stability & basements

Townscape & visual assessment specialists3 documents
  • O33

    Tall Building / Skyline Impact Assessment

    Strategic height and views

    Subject: Major development & strategic assessments

    Other input may include: Design team; Heritage consultants.

  • D11

    Townscape and Heritage Visual Impact Assessment

    Significant buildings or sensitive locations

    Subject: Heritage, conservation & archaeology

    Other input may include: Heritage consultants; Design team.

  • O07

    Townscape and Visual Impact Assessment

    Significant townscape effects

    Subject: Major development & strategic assessments

    Other input may include: Heritage consultants; Design team.

Transport & highways consultants31 documents
  • H21

    Car Club / Car-Free Development Strategy

    Car-free or car-lite proposals

    Subject: Transport, highways & parking

  • N22

    Commercial Parking and Traffic Statement

    Employee and visitor movements

    Subject: Commercial & mixed-use operations

  • H06

    Construction Logistics Plan

    Construction access and servicing logistics

    Subject: Transport, highways & parking

    Other input may include: Construction management team.

  • M02

    Construction Logistics Plan

    Vehicle movements, deliveries and access

    Subject: Construction, demolition & logistics

  • H05

    Construction Traffic Management Plan

    Construction vehicle impacts

    Subject: Transport, highways & parking

  • M12

    Contractor Access / Delivery Strategy

    Construction servicing

    Subject: Construction, demolition & logistics

  • H19

    Cycle Parking Strategy

    Capacity and accessibility

    Subject: Transport, highways & parking

  • N15

    Delivery and Servicing Management Plan

    Commercial deliveries

    Subject: Commercial & mixed-use operations

  • H07

    Delivery and Servicing Plan

    Operational deliveries and collections

    Subject: Transport, highways & parking

  • H24

    Disabled Parking and Accessibility Strategy

    Inclusive vehicle access

    Subject: Transport, highways & parking

    Other input may include: Inclusive access specialists.

  • H20

    Electric Vehicle Charging Strategy

    EV infrastructure

    Subject: Transport, highways & parking

    Other input may include: Building services engineers.

  • H14

    Emergency Vehicle Access Assessment

    Emergency access

    Subject: Transport, highways & parking

    Other input may include: Fire safety engineers.

  • H08

    Parking Assessment

    Proposed parking provision

    Subject: Transport, highways & parking

  • H10

    Parking Stress Assessment

    Residential parking impacts

    Subject: Transport, highways & parking

  • H09

    Parking Survey

    Existing parking pressure

    Subject: Transport, highways & parking

  • H18

    Pedestrian and Cycle Movement Assessment

    Active-travel impacts

    Subject: Transport, highways & parking

  • M11

    Pedestrian and Public Safety Strategy

    Public protection during construction

    Subject: Construction, demolition & logistics

  • H13

    Refuse Vehicle Tracking

    Waste collection arrangements

    Subject: Transport, highways & parking

    Other input may include: Waste management specialists.

  • H03

    Residential Travel Plan

    Sustainable travel measures

    Subject: Transport, highways & parking

  • H16

    Road Safety Audit

    Highway safety considerations

    Subject: Transport, highways & parking

  • H25

    School / Healthcare Travel and Access Statement

    Relevant non-residential uses

    Subject: Transport, highways & parking

  • O30

    Strategic Transport Assessment

    Network-wide travel impacts

    Subject: Major development & strategic assessments

  • H12

    Swept Path Analysis

    Vehicle turning and manoeuvring

    Subject: Transport, highways & parking

  • M10

    Temporary Traffic Management Plan

    Highway changes during construction

    Subject: Construction, demolition & logistics

  • H17

    Traffic Impact / Junction Capacity Assessment

    Highway network effects

    Subject: Transport, highways & parking

  • H11

    Transport Accessibility / PTAL Assessment

    Public transport accessibility

    Subject: Transport, highways & parking

  • H02

    Transport Assessment

    Larger or materially impactful developments

    Subject: Transport, highways & parking

  • H01

    Transport Statement

    Transport impacts of smaller schemes

    Subject: Transport, highways & parking

  • H23

    Trip Generation and Distribution Assessment

    Forecast traffic generation

    Subject: Transport, highways & parking

  • H15

    Visibility Splay Assessment

    Access safety

    Subject: Transport, highways & parking

  • H04

    Workplace Travel Plan

    Commercial element of mixed-use schemes

    Subject: Transport, highways & parking

Unexploded ordnance specialists1 documents
  • G21

    Unexploded Ordnance Risk Assessment

    Unusual site-specific ground hazards

    Subject: Ground conditions, stability & basements

Utilities engineers & surveyors2 documents
  • G19

    Utilities and Underground Services Survey

    Underground infrastructure constraints

    Subject: Ground conditions, stability & basements

  • O10

    Utilities Capacity Assessment

    Energy, water and sewerage infrastructure

    Subject: Major development & strategic assessments

Viability surveyors & development valuers5 documents
  • K05

    Affordable Housing Viability Assessment

    Where viability is advanced as justification

    Subject: Housing, accommodation & viability

    Other input may include: Planning consultants; Cost consultants.

  • N09

    Commercial Viability Assessment

    Where commercial viability is material

    Subject: Commercial & mixed-use operations

  • K06

    Financial Viability Appraisal

    Planning viability where justified

    Subject: Housing, accommodation & viability

    Other input may include: Cost consultants; Development team.

  • O24

    Financial Viability Assessment

    Where justified

    Subject: Major development & strategic assessments

    Other input may include: Cost consultants; Planning consultants.

  • K07

    Viability Review Mechanism Proposal

    Where affordable housing reviews are required

    Subject: Housing, accommodation & viability

    Other input may include: Planning obligations advisers.

Waste & resource management consultants4 documents
  • N16

    Commercial Waste Management Plan

    Separation and collection of waste

    Subject: Commercial & mixed-use operations

  • M16

    Demolition Waste and Reuse Audit

    Where policy requires material recovery

    Subject: Construction, demolition & logistics

    Other input may include: Demolition specialists; Carbon consultants.

  • O32

    Operational Waste / Estate Servicing Strategy

    Waste and servicing of all buildings

    Subject: Major development & strategic assessments

    Other input may include: Transport consultants; Estate management team.

  • M07

    Site Waste Management Strategy

    Construction waste and material flows

    Subject: Construction, demolition & logistics

APPLICATION & CONDITION DISCHARGE

Keep submission stages clear.

The council’s local validation requirements and the issues affecting the site determine what is needed at application stage.

Planning-stage evidence

Planning justification, heritage, amenity, transport, ecology, drainage and other relevant assessments help the council understand the proposal. Forms, certificates and submission records support the application process.

After permission, where required

Detailed management strategies, archaeological investigation arrangements, remediation evidence and other condition-specific information may be needed after permission. A final Biodiversity Gain Plan is distinct from application-stage baseline information and a draft gain strategy.

Separate technical approvals

Building Regulations calculations, detailed construction packages and private-law reports are outside this planning document register. A planning-stage ground, stability or fire assessment addresses the planning issues within its agreed scope.

YOUR QUESTIONS ANSWERED

Frequently asked questions

Clear answers to help you plan your next step.

Which supporting documents does my application need?

The required evidence depends on the application type, site constraints, proposal and relevant local submission requirements. Send us your drawings and council advice so we can identify the reports and specialist inputs to consider. The document register is a guide; every listed item is not required for every application.

Are site visits and specialist surveys included?

Only where expressly included in your appointment. A desktop review, site visit, monitoring exercise and intrusive investigation are different tasks. We identify the relevant specialist work and agree the scope and costs before it is commissioned.

Are the report previews examples of completed client reports?

The covers and contents pages are illustrative examples of the document format. The written section guidance explains what a report may contain. Your final document is tailored to the site, instruction, evidence and relevant planning requirements.

What is the difference between validation and planning approval?

Validation concerns whether the application contains the information needed for the council to accept it for consideration. Approval concerns the merits of the proposal. A validated application can still require further evidence and does not guarantee permission.

How do your specialists work together on a project?

We bring the relevant planning consultants and specialist providers into a coordinated project team. They work from an agreed brief and current proposal, with dependencies and design changes discussed across disciplines. Each consultant remains responsible for their own professional advice and agreed deliverables.

YOUR PROJECT DOCUMENT SCHEDULE

Identify what your application needs.

Send the site address, proposals and any council comments so we can scope the relevant documents.

Call 020 8004 4464 or email info@greencodeconsultants.com.

Discuss supporting documents