What reports do I need for a planning application in London?
It depends on the council, the type of project and the site. Every London council publishes a local validation list setting out what must be submitted, and an application missing a required report is not validated, so the decision clock never starts.
Reports almost every application needs
- Drawings and a location plan, prepared to scale from a measured survey.
- A planning statement for anything beyond a simple householder application, explaining how the proposal meets local and London Plan policy.
- A design and access statement for development in a conservation area, for listed buildings and for most applications for new homes.
Reports triggered by the site
| Site condition | Report usually required |
|---|---|
| Flood Zone 2 or 3, or an area at risk of surface water flooding | Flood risk assessment |
| Conservation area or listed building | Heritage statement |
| Trees on or next to the site, or a tree preservation order | Arboricultural report |
| New buildings or extensions close to neighbouring windows | Daylight and sunlight assessment |
| Basement excavation | Basement impact assessment and construction method statement |
| Busy roads, railways or commercial neighbours | Noise impact assessment, sometimes air quality assessment |
| Possible protected species or habitats | Ecological assessment |
| Former industrial or commercial land | Contaminated land desk study |
Reports triggered by the proposal
- New homes: often a transport statement, drainage strategy, energy statement and, for most non-householder schemes, biodiversity net gain information.
- Buildings of 10 or more homes are major applications and usually add viability, sustainability, overheating and whole-life carbon reports.
- Major developments need a fire statement under London Plan policy D12, and residential buildings of 18 metres or 7 storeys or more also need a planning gateway one fire statement.
How to avoid surprises
Check the council's validation list before any report is commissioned, and commission reports together so they are based on the same drawings. A late design change can mean several reports need updating. Our free application checker shows which reports a council is likely to ask for, and a validation review checks a submission before it goes in.
Check what your council will ask for
Choose your council, project and site constraints to see the reports you are likely to need, with starting prices.