PLANNING CONSULTANTS · BARKING AND DAGENHAM

Planning consultants in Barking and Dagenham

We prepare and coordinate the planning case and specialist reports for sites in Barking and Dagenham covering Barking, Dagenham, Becontree, Chadwell Heath, Rush Green and Marks Gate. This page sets out what London Borough of Barking and Dagenham asks for when you apply, with links to the council's own documents.

THE COUNCIL'S DOCUMENTS

What Barking and Dagenham
judges you against.

Validation list. Validation Checklist: Application for Full Planning Permission and Major Development within the London Borough of Barking and Dagenham (2024-05-02). An application missing a required document can be made invalid, which delays the decision.

Development plan. Barking and Dagenham Local Plan 2037 (adopted, 2024); The London Plan 2021 (adopted, 2021).

National policy. The National Planning Policy Framework and, for every London council, the London Plan 2021 sit alongside the local plan.

LOCAL PLANNING POINTS

Things that shape applications in Barking and Dagenham.

Checked against the council's published policy and guidance. Each point links to its source.

  • Single-storey rear extensions to terraced and semi-detached houses should not normally be more than 3.65m deep from the original rear wall (Residential Extensions and Alterations SPD, 2012). The guidance is old, so how much weight it now carries should be checked case by case. Source
  • An Article 4 direction covering the whole borough has required planning permission to convert a house into a small HMO since 14 May 2012. Source
  • Since 22 February 2022, an Article 4 direction has removed permitted development rights for adding storeys to houses and commercial buildings across the whole borough except designated industrial land. Source
  • Article 4 directions removing permitted development rights for porches across the Becontree Estate, and for side and roof alterations on its corner blocks, were approved by Cabinet in November 2025 with introduction planned for November 2026; check whether they are in force. Source
  • There are four conservation areas: Abbey and Barking Town Centre, Abbey Road Riverside, Chadwell Heath Anti-aircraft Gun Site and Dagenham Village. Source
  • A selective licensing scheme covering three designated areas of the borough runs from 6 April 2025 to 5 April 2030. Source
  • Article 4 direction: Houses in multiple occupation. Changing a family house (C3) into a small house in multiple occupation (C4) needs planning permission, across the whole borough. Source
  • 4 further Article 4 directions apply to particular areas or conservation areas. Council list

REPORTS BARKING AND DAGENHAM ASKS FOR

Barking and Dagenham's validation list, report by report.

Which of these your application needs depends on the project and the site. In Barking and Dagenham, extra reports are triggered most often by a conservation area, tall buildings, a listed building, near a listed building, air quality management areas, close neighbours. Enter the address in our application checker to see the list for your site.

ReportLevelWhen it is neededPolicy
Access StatementRequiredRequired for new houses and flats, mixed use, change of use to residential and residential conversions.Applies to: one new home, 2 to 9 homes, major schemes, changes of useSource
Affordable Housing StatementRequiredRequired for schemes of 10 or more homes, or smaller schemes on sites capable of accommodating 10 homes; must set out tenure, mix and unit sizes.Applies to: major schemes, 2 to 9 homesSource
Tree Survey / Arboricultural ImplicationsRequiredRequired where TPO trees, conservation area trees or other trees on or next to the site (including street trees) could be affected.Applies to: all applicationsSource
Biodiversity Net Gain ReportRequiredNon-exempt development must show 10% BNG using the statutory metric prepared by an independent ecologist; majors also need a draft gain plan and monitoring plan, and exempt schemes need an exemption statement.Applies to: one new home, 2 to 9 homes, major schemes, changes of use, commercial, basementsEnvironment Act 2021
Children and Young People's Play and Informal Recreation StrategyRequiredAll major housing schemes must show play and open space provision using the GLA play space calculator.Applies to: major schemesSource
Crime Impact StatementRequiredMajor development, especially large housing schemes, must show how Secured by Design principles are applied.Applies to: major schemesSource
Design and Access Statement (heritage)RequiredHouseholder-scale works also need a DAS where they are in, or affect the setting of, a conservation area or listed building.Applies to: house extensionsSource
Draft Heads of TermsRequiredRequired for all majors and wherever a legal agreement is needed.Applies to: major schemesSource
Habitat Survey and Report (Phase 1)RequiredAll major development needs a pre-submission Phase 1 habitat survey report by a qualified ecologist, even if nothing protected is found.Applies to: major schemesSource
Energy and Sustainability Assessment (incl. whole life-cycle carbon)RequiredAll major development must provide an energy and sustainability assessment with a whole life-cycle carbon calculation, plus BREEAM pre-assessment for qualifying commercial floorspace.Applies to: major schemesLondon Plan
Flood Risk AssessmentRequiredRequired for all proposals in Flood Zones 2 and 3, with a sequential test where appropriate.Applies to: all applicationsSource
Flood Risk Assessment (large sites)RequiredRequired for all sites of 1 hectare or more even in Flood Zone 1.Applies to: all applicationsSource
Green Belt AssessmentRequiredAny Green Belt development involving external alterations must include a Green Belt assessment.Applies to: all applicationsSource
Health Impact AssessmentRequiredMajor residential and mixed-use schemes must include an HIA.Applies to: major schemesSource
Heritage StatementRequiredNeeded where works affect a conservation area, listed or locally listed building, archaeological site, scheduled monument or other heritage asset, or their settings.Applies to: all applicationsSource
Overheating AssessmentRequiredMajor development containing homes must show passive and other measures to control overheating.Applies to: major schemesSource
Fire Safety / Prevention Measures statementRequiredMajor applications and tall buildings need a fire statement by a qualified person in line with the London Plan.Applies to: major schemesLondon Plan D12
Fire Safety / Prevention Measures statement (tall buildings)RequiredAny tall building proposal requires a qualified fire safety statement.Applies to: all applicationsLondon Plan D12
Planning StatementRequiredRequired for all major development and for any proposal that departs from the development plan.Applies to: major schemesSource
Site Waste Management PlanRequiredRequired for all major applications.Applies to: major schemesSource
Statement of Community InvolvementRequiredMajor and large-scale schemes must evidence pre-submission engagement.Applies to: major schemesSource
Sustainable Drainage Strategy and SuDS ProformaRequiredAll major applications need a SuDS strategy and proforma.Applies to: major schemesSource
Urban Greening Factor evaluationRequiredAll major development must calculate its Urban Greening Factor score.Applies to: major schemesLondon Plan G5
Whole life-cycle carbon assessmentRequiredMajor schemes must calculate whole life-cycle carbon emissions using a recognised assessment as part of the energy submission.Applies to: major schemesLondon Plan
Air Quality AssessmentWhere relevantNeeded where a scheme is likely to affect air quality or introduce users to poor air quality; the whole borough is an AQMA.Applies to: one new home, 2 to 9 homes, major schemes, changes of use, commercial, basementsSource
Community Facility Need StatementWhere relevantRequired for new, extended, replaced or lost community facilities (C2, F1, F2), showing need or surplus and marketing.Applies to: changes of use, commercial, major schemesSource
Construction Environmental Management Plan (draft)Where relevantAsked for on major schemes with significant construction impacts and on minor schemes in sensitive locations.Applies to: major schemes, 2 to 9 homes, one new home, commercial, basementsSource
Construction Logistics Plan (draft)Where relevantAsked for on major schemes generating significant construction traffic, and possibly on minor schemes in sensitive locations.Applies to: major schemes, 2 to 9 homes, one new home, commercial, basementsSource
Land Contamination AssessmentWhere relevantRequired for development on brownfield land or where contamination is known or suspected.Applies to: one new home, 2 to 9 homes, major schemes, changes of use, commercial, basementsSource
Daylight/Sunlight AssessmentWhere relevantNeeded where neighbours' light could be harmed, and for all majors to show internal light levels; to follow BRE 2022 guidance.Applies to: all applicationsSource
Delivery and Servicing PlanWhere relevantNeeded for schemes with regular goods or commercial vehicle activity, or in sensitive residential/mixed-use locations.Applies to: major schemes, commercial, 2 to 9 homesSource
Design and Access StatementWhere relevantNeeded for major development, and for any development in a conservation area or affecting the setting of a conservation area or listed building.Applies to: one new home, 2 to 9 homes, major schemes, commercial, basements, changes of useSource
Economic StatementWhere relevantRequired for new employment development, including change of use, creating over 5,000 m2.Applies to: commercial, major schemes, changes of useSource
Viability AssessmentWhere relevantMust be submitted upfront wherever a policy requirement (including affordable housing and tenure mix) is reduced on viability grounds; submissions are published.Applies to: major schemes, 2 to 9 homes, commercialSource
Lighting AssessmentWhere relevantRequired where external lighting is proposed or would be needed.Applies to: one new home, 2 to 9 homes, major schemes, changes of use, commercial, basementsSource
Noise AssessmentWhere relevantNeeded where a scheme may disturb occupiers, places noise-sensitive uses near noise sources, or adds noisy plant; plant should be 10 dBA below background, assessed to BS 4142.Applies to: all applicationsSource
Odour AssessmentWhere relevantRequired for majors or sensitive uses near an odour source, or where the use may create off-site odour.Applies to: major schemes, commercial, changes of useSource
Sustainable Drainage Strategy (minor)Where relevantMinor applications need a SuDS strategy where they would worsen surface water or sit in a critical drainage area.Applies to: one new home, 2 to 9 homes, commercial, changes of use, basementsSource
Visual Impact AssessmentWhere relevantAsked for where a proposal, such as a tall building, may cause adverse visual effects.Applies to: major schemes, commercialSource
Transport Assessment / Transport StatementWhere relevantNeeded where a scheme has significant transport implications, scaled according to DfT thresholds and TfL guidance.Applies to: major schemes, 2 to 9 homes, commercial, changes of useSource
Travel PlanWhere relevantNeeded where transport impacts are significant and TfL travel plan thresholds are exceeded.Applies to: major schemes, commercialSource
Ventilation/Extraction StatementWhere relevantRequired for restaurants/cafes, B2 and certain sui generis uses (e.g. takeaways, pubs) and any use with substantial extraction equipment.Applies to: commercial, changes of useSource
Wind and Microclimate StudyWhere relevantRequired for large schemes or any proposal including a tall building.Applies to: major schemesSource

OUR SERVICES IN BARKING AND DAGENHAM

Every report, one coordinated team.

All 54 services are available for sites in Barking and Dagenham. Prices are starting estimates; we confirm the fee in writing before appointment.

Neighbouring councils

YOUR QUESTIONS ANSWERED

Planning in Barking and Dagenham: FAQs

Still have a question?

Tell us about the site and we will confirm what Barking and Dagenham will need and what it should cost.

Make an enquiry
Which reports does Barking and Dagenham require for a house extension?

Barking and Dagenham's list adds reports mainly when the site has constraints, such as a conservation area, tall buildings, a listed building, near a listed building, air quality management areas, close neighbours. Drawings and the forms are always needed. Our application checker lists the reports for your address.

How up to date is Barking and Dagenham's validation list?

The list we use is "Validation Checklist: Application for Full Planning Permission and Major Development within the London Borough of Barking and Dagenham", dated 2024-05-02. Councils revise their lists, so we confirm the current version before you commission reports.

Do you cover every part of Barking and Dagenham?

Yes. We work across the whole of Barking and Dagenham, including the postcode districts IG11, RM6, RM7, RM8, RM9, RM10 and areas such as Barking, Dagenham, Becontree, Chadwell Heath, Rush Green and Marks Gate.

Where are you based?

Our office is at Unit D New Wave House, 4 Humber Road, London NW2 6DW, and we work on sites across all 32 London boroughs, the City of London and OPDC.

YOUR NEXT STEP

Planning an application in Barking and Dagenham?

Tell us about the site and what you want to build. We will tell you which reports Barking and Dagenham is likely to need and what they should cost.

Call 020 8004 4464 or email info@greencodeconsultants.com.

Make an enquiry