PLANNING CONSULTANTS · KINGSTON UPON THAMES

Planning consultants in Kingston upon Thames

We prepare and coordinate the planning case and specialist reports for sites in Kingston upon Thames covering Kingston, Surbiton, Norbiton, New Malden, Tolworth and Chessington. This page sets out what Royal Borough of Kingston upon Thames asks for when you apply, with links to the council's own documents.

THE COUNCIL'S DOCUMENTS

What Kingston upon Thames
judges you against.

Validation list. Validation Local List (Royal Borough of Kingston upon Thames) (2024-02). An application missing a required document can be made invalid, which delays the decision.

Development plan. Kingston Core Strategy (adopted, 2012); Kingston Town Centre Area Action Plan (adopted, 2008); Kingston Local Plan 2028-2043 (Regulation 19 Publication Version) (emerging, 2026).

National policy. The National Planning Policy Framework and, for every London council, the London Plan 2021 sit alongside the local plan.

LOCAL PLANNING POINTS

Things that shape applications in Kingston upon Thames.

Checked against the council's published policy and guidance. Each point links to its source.

  • Single-storey rear extensions should generally be no more than 3 to 3.5m deep, and no more than 3m high with a flat roof or 4m with a pitched roof (Residential Design SPD, 2013). The guidance is over ten years old, so its weight should be checked case by case. Source
  • Single-storey side extensions should be no wider than half the original house, set in at least 250mm from the boundary and set back at least 500mm from the front wall (Residential Design SPD, 2013). Source
  • There are 26 conservation areas in the borough, including Surbiton Hill Park, The Groves, Old Malden and Kingston Hill. Source
  • A new Kingston Local Plan was published for Regulation 19 consultation from July to September 2026 and is due to be submitted to the Planning Inspectorate in December 2026, with examination expected in 2027. Source

REPORTS KINGSTON UPON THAMES ASKS FOR

Kingston upon Thames's validation list, report by report.

Which of these your application needs depends on the project and the site. In Kingston upon Thames, extra reports are triggered most often by tall buildings, close neighbours, archaeological priority areas, critical drainage areas, protected species, noisy locations. Enter the address in our application checker to see the list for your site.

ReportLevelWhen it is neededPolicy
Accessibility StatementRequiredAny new homes, including conversions and changes of use, must show at least 10% wheelchair user dwellings (M4(3)) and the rest M4(2).Applies to: one new home, 2 to 9 homes, major schemes, changes of useLondon Plan D5, D7
Air Quality Assessment and Air Quality Neutral AssessmentRequiredAll major applications must assess air quality and show the scheme is at least air quality neutral.Applies to: major schemesLondon Plan SI1
Basement Impact Assessment and Construction Method StatementRequiredAll basement development needs an assessment of ground, structural, groundwater and drainage effects with an outline construction method statement, signed by a chartered civil or structural engineer.Applies to: basementsLondon Plan D10
Delivery and Servicing Plan (outline)RequiredAll major applications need an outline delivery and servicing plan with swept path analysis.Applies to: major schemesLondon Plan T7
Biodiversity ChecklistRequiredEvery application must include the council's completed biodiversity checklist.Applies to: all applicationsKingston Biodiversity Action Plan
Energy Assessment and Overheating MitigationRequiredAll major schemes must follow GLA energy guidance, show at least a 35% on-site carbon cut beyond Part L 2021 and include dynamic overheating modelling.Applies to: major schemesLondon Plan SI2, SI3, SI4
Health Impact AssessmentRequiredAll major schemes need a rapid health impact assessment, and Mayor-referable schemes a full one.Applies to: major schemesLondon Plan GG3
Fire Statement (London Plan) or Reasonable Exception StatementRequiredAll applications must address fire safety, with a full fire statement recommended for major schemes; a reasonable exception statement is allowed only for minor works adding no units, lifts or external material changes.Applies to: all applicationsLondon Plan D12
Planning StatementRequiredAll major applications need a planning statement assessing policy compliance and summarising other documents.Applies to: major schemesKingston Local Plan; London Plan
Tall Building StatementRequiredTall buildings as defined in the London Plan need visual, physical and movement impact studies with verified views.Applies to: all applicationsLondon Plan D9, D3, HC1
Travel PlanRequiredAll major applications need a travel plan with measurable targets.Applies to: major schemesLondon Plan T4
Urban Greening Factor StatementRequiredAll major applications must show they meet the minimum urban greening factor.Applies to: major schemesLondon Plan G5
Water Consumption StatementRequiredNew homes must meet 105 litres per person per day and new commercial space BREEAM Excellent water credits.Applies to: one new home, 2 to 9 homes, major schemes, commercial, changes of useLondon Plan SI5
45 and 25 Degree Plans and StatementWhere relevantExtensions and outbuildings must show the 45-degree test, and two-storey or higher extensions the 25-degree test; failing these triggers a daylight and sunlight report.Applies to: house extensions, basementsResidential Design SPD (Guidance 17, 18)
Affordable Housing StatementWhere relevantAll major residential schemes, or any scheme including affordable homes, must set out the affordable unit schedule, tenures and rents.Applies to: major schemesLondon Plan Chapter 4 (H4-H6)
Tree Survey, Arboricultural Impact Assessment and Method StatementWhere relevantNeeded where trees may be affected, with CAVAT values for trees lost and a method statement where work enters root protection areas.Applies to: all applicationsLondon Plan G1, G5, G7
Archaeological AssessmentWhere relevantMajor schemes in an Archaeological Priority Area or on sites over 0.5 ha need at least a desk-based assessment, as do some minor schemes in Tier 1 or 2 priority areas.Applies to: major schemes, 2 to 9 homes, one new home, commercial, basementsLondon Plan HC1
Biodiversity Gain Plan / BNG informationWhere relevantApplications must state whether the statutory biodiversity gain condition applies, with a pre-development metric and habitat plan, or explain an exemption.Applies to: one new home, 2 to 9 homes, major schemes, commercial, changes of useDMPO 2015 Article 7
Circular Economy StatementWhere relevantSchemes referable to the Mayor of London must submit a circular economy statement.Applies to: major schemesLondon Plan SI7
Construction Management Plan (outline)Where relevantNeeded for any basement, substantial demolition or excavation, confined sites or sites near sensitive receptors, and major schemes with external works.Applies to: basements, major schemesLondon Plan T7
Land Contamination AssessmentWhere relevantNeeded for contaminated or former industrial land, all major schemes, and sites on or next to public open space.Applies to: all applicationsEnvironmental Protection Act 1990 Part IIA
Daylight, Sunlight and Overshadowing AssessmentWhere relevantRequired for all major residential schemes and wherever light to neighbouring land may be affected, to BRE 2022 guidance; householders may rely on the 45 and 25 degree tests.Applies to: all applicationsBRE BR209 (2022)
Design and Access StatementWhere relevantRequired for major schemes, listed building consent, and in conservation areas where one or more dwellings or 100 sqm or more of floorspace is created.Applies to: all applicationsDMPO 2015
Ecology Surveys and ReportsWhere relevantAll major applications need an ecological appraisal, usually an ecological impact assessment, with any recommended species surveys submitted up front.Applies to: major schemesLondon Plan G1-G9
Affordable Housing Financial Viability AssessmentWhere relevantMajor residential schemes offering under 35% affordable housing (50% on public land) must submit a full viability assessment with a working model, reviewed at the applicant's cost.Applies to: major schemesLondon Plan H4, H6
Fire Statement (Gateway One)Where relevantNeeded where a building of 18 m or 7+ storeys would contain two or more dwellings or educational accommodation, using the national form.Applies to: 2 to 9 homes, major schemes, changes of use, commercialDMPO 2015 (Gateway One)
Flood Risk AssessmentWhere relevantNeeded for sites in Flood Zone 2 or 3, sites at surface water flood risk and non-householder sites of 1 ha or more in Flood Zone 1; householders in these zones can use the Environment Agency form.Applies to: all applicationsLondon Plan SI12; Kingston SFRA
Heritage StatementWhere relevantNeeded for proposals affecting designated or non-designated heritage assets or their setting, or ground disturbance in an Archaeological Priority Area.Applies to: all applicationsLondon Plan HC1
Lighting AssessmentWhere relevantNeeded where lighting, especially floodlighting, would be visible off-site or spill light, including effects on bats.Applies to: all applicationsNPPG Light Pollution
Loss of Employment Land / Marketing AssessmentWhere relevantLoss of jobs, commercial floorspace or industrial capacity needs justification and marketing evidence of up to two years.Applies to: changes of use, commercial, major schemesLondon Plan Chapter 6
Acoustic and Vibration Impact AssessmentWhere relevantNeeded for noise-generating plant such as air conditioning or air source heat pumps, and for noise-sensitive uses near noise sources.Applies to: all applicationsLondon Plan D13, D14
Statement of Community InvolvementWhere relevantAll major applications, and sensitive schemes of significant public interest, must show how the wider community was engaged before submission.Applies to: major schemesKingston SCI
Drainage Strategy and SuDS ReportWhere relevantAll major schemes, and any site in a Critical Drainage Area, need a drainage strategy aiming for greenfield run-off with the borough SuDS proforma.Applies to: all applicationsLondon Plan SI13
BREEAM Pre-AssessmentWhere relevantNon-residential development over 500 sqm, including conversions and changes of use, must show it will reach BREEAM Outstanding.Applies to: commercial, major schemes, changes of useBREEAM
Transport AssessmentWhere relevantAll major developments and any scheme with significant transport implications need a transport assessment to TfL guidance.Applies to: major schemesLondon Plan T4-T6
Transport StatementWhere relevantNeeded for schools, nurseries, hospitals and places of worship, for 100 sqm or more of new Class E floorspace, and other minor schemes with transport impacts.Applies to: commercial, changes of use, 2 to 9 homesLondon Plan T4
Retrofit-first StatementWhere relevantMajor schemes involving demolition must justify why the existing building cannot be retained or reused.Applies to: major schemesLondon Plan SI2, SI7
Wind Impact AssessmentWhere relevantBuildings of 7+ storeys, or much taller than their surroundings, need wind tunnel testing against Lawson criteria.Applies to: major schemes, commercial, 2 to 9 homesLondon Plan D9

OUR SERVICES IN KINGSTON UPON THAMES

Every report, one coordinated team.

All 54 services are available for sites in Kingston upon Thames. Prices are starting estimates; we confirm the fee in writing before appointment.

Neighbouring councils

YOUR QUESTIONS ANSWERED

Planning in Kingston upon Thames: FAQs

Still have a question?

Tell us about the site and we will confirm what Kingston upon Thames will need and what it should cost.

Make an enquiry
Which reports does Kingston upon Thames require for a house extension?

Kingston upon Thames's validation list requires Biodiversity Checklist, Fire Statement (London Plan) or Reasonable Exception Statement for householder applications, before any site constraints are taken into account. Constraints such as a conservation area, flood zone or protected trees add further reports. Our application checker lists them for your address.

How up to date is Kingston upon Thames's validation list?

The list we use is "Validation Local List (Royal Borough of Kingston upon Thames)", dated 2024-02. Councils revise their lists, so we confirm the current version before you commission reports.

Do you cover every part of Kingston upon Thames?

Yes. We work across the whole of Kingston upon Thames, including the postcode districts KT1, KT2, KT3, KT4, KT5, KT6, KT9 and areas such as Kingston, Surbiton, Norbiton, New Malden, Tolworth and Chessington.

Where are you based?

Our office is at Unit D New Wave House, 4 Humber Road, London NW2 6DW, and we work on sites across all 32 London boroughs, the City of London and OPDC.

YOUR NEXT STEP

Planning an application in Kingston upon Thames?

Tell us about the site and what you want to build. We will tell you which reports Kingston upon Thames is likely to need and what they should cost.

Call 020 8004 4464 or email info@greencodeconsultants.com.

Make an enquiry