PLANNING CONSULTANTS · WESTMINSTER

Planning consultants in Westminster

We prepare and coordinate the planning case and specialist reports for sites in Westminster covering Maida Vale, St John's Wood, Marylebone, Pimlico, Bayswater and Queen's Park. This page sets out what City of Westminster asks for when you apply, with links to the council's own documents.

THE COUNCIL'S DOCUMENTS

What Westminster
judges you against.

Validation list. Local List of Planning Application Validation Requirements (WCC Local List of Validation Requirements 2026) (July 2026). An application missing a required document can be made invalid, which delays the decision.

Development plan. Westminster City Plan 2019-2040 (2026), incorporating the City Plan Partial Review (adopted, 2026).

National policy. The National Planning Policy Framework and, for every London council, the London Plan 2021 sit alongside the local plan.

LOCAL PLANNING POINTS

Things that shape applications in Westminster.

Checked against the council's published policy and guidance. Each point links to its source.

  • There are 56 conservation areas in Westminster. Source
  • The City Plan 2019-2040 (2026) was adopted on 21 January 2026 after a partial review, replacing the 2021 version; work on a full new City Plan began in 2026. Source
  • The 2026 City Plan brings in a retrofit-first approach before demolition, and for the first time developments of fewer than 10 homes must contribute to affordable housing. Source
  • Selective licensing of private rented homes started on 24 November 2025 and covers 15 of Westminster's 18 wards. Source
  • A renewed borough-wide additional HMO licensing scheme runs from 31 August 2026 to 30 August 2031. Source
  • Article 4 direction: Basements. Basement development, lightwells and other development below houses and their gardens needs planning permission, across the whole city. Source
  • Article 4 direction: Class E to residential (Central Activities Zone). Converting shops, offices and other Class E premises to homes (Class MA) needs planning permission in specified parts of the Central Activities Zone (as modified by the Secretary of State in July 2022). Source
  • Article 4 direction: Class E to residential (outside the CAZ). Converting shops, offices and other Class E premises to homes (Class MA) needs planning permission in specified town centres and parades outside the Central Activities Zone. Source
  • 7 further Article 4 directions apply to particular areas or conservation areas. Council list

REPORTS WESTMINSTER ASKS FOR

Westminster's validation list, report by report.

Which of these your application needs depends on the project and the site. In Westminster, extra reports are triggered most often by archaeological priority areas, trees on or near the site, a conservation area, near a listed building, air quality management areas, protected species. Enter the address in our application checker to see the list for your site.

ReportLevelWhen it is neededPolicy
Affordable Housing StatementRequiredAny scheme creating new homes must explain its affordable housing offer.Applies to: one new home, 2 to 9 homes, major schemesCity Plan 13; London Plan H5
Structural Methodology StatementRequiredAll basements, and other significant excavation or structural alteration, need a statement self-certified by a qualified engineer, with soil, geohydrology and SuDS information for basements.Applies to: basementsCity Plan 42, 50
Contaminated Land Assessment (basements)RequiredEvery basement application must include a contaminated land assessment including radon.Applies to: basementsCity Plan 37
Energy Strategy (including Cooling Strategy)RequiredAll majors need an energy strategy with GLA carbon spreadsheets, a cooling (overheating) strategy and Be Seen commitments.Applies to: major schemesCity Plan 40; London Plan SI2, SI4
Flood Risk Assessment (basements)RequiredEvery basement application must include a flood risk assessment.Applies to: basementsCity Plan 39, 45
London Plan Fire StatementRequiredAll major applications need an independent fire statement by a third-party assessor; Gateway One fire statements also apply to relevant 18 m+ residential buildings.Applies to: major schemesLondon Plan D12
SuDS Design Strategy / London Sustainable Drainage ProformaRequiredAll major developments must submit a sustainable drainage strategy with the London SuDS proforma.Applies to: major schemesCity Plan 39; London Plan SI13
Whole Life Carbon AssessmentRequiredRequired for all majors (except change of use only), Mayor-referable schemes and substantial demolition.Applies to: major schemesCity Plan 42, 43; London Plan SI2
Air Quality AssessmentWhere relevantRequired for all majors, polluting or combustion uses, sensitive uses, and new homes in Air Quality Focus Areas.Applies to: major schemes, changes of use, commercial, one new home, 2 to 9 homesCity Plan 36; London Plan SI1
Tree Survey / Arboricultural AssessmentWhere relevantRequired where trees on or next to the site, including street trees, may be affected; BS5837:2012 applies.Applies to: all applicationsCity Plan 38, 50; London Plan G7
Archaeological AssessmentWhere relevantMajors with excavation in APA Tiers 1-3, and any other excavation in Tiers 1-2.Applies to: all applicationsCity Plan 44; London Plan HC1
Biodiversity Net Gain informationWhere relevantSchemes subject to the statutory BNG condition must submit the metric and habitat plan; all applications must state whether BNG applies.Applies to: one new home, 2 to 9 homes, major schemes, changes of use, commercial, basementsCity Plan 34; London Plan G6
Code of Construction Practice checklistWhere relevantA signed CoCP checklist is needed for all basement schemes (Checklist B) and other Level 1 and 2 developments (Checklist A).Applies to: basements, major schemes, commercial, 2 to 9 homesCity Plan 37, 41, 50
Contaminated Land AssessmentWhere relevantRequired for all basements (with a radon assessment) and where contamination is known or suspected.Applies to: all applicationsCity Plan 37
Daylight and Sunlight AssessmentWhere relevantRequired where light to neighbouring sensitive uses is likely to be harmed, and may be asked for where new homes are created.Applies to: all applicationsCity Plan 7, 16, 38, 45
Design and Access StatementWhere relevantNeeded for major development, for schemes creating dwellings or 100 sqm+ in a conservation area or the World Heritage Site, and for all listed building consents.Applies to: all applicationsLondon Plan D4, D5; City Plan 42
Biodiversity / Ecological ReportWhere relevantA preliminary ecological appraisal is needed near a SINC or where protected species, priority habitats or other features (e.g. within 50 m of water or woodland) may be affected.Applies to: all applicationsCity Plan 38; London Plan G6
Affordable Housing Viability AssessmentWhere relevantRequired where a residential scheme relies on viability to justify less than policy-compliant affordable housing.Applies to: one new home, 2 to 9 homes, major schemesCity Plan 13; London Plan H4
Flood Risk AssessmentWhere relevantRequired on sites of 1 ha+, in Flood Zones 2 and 3 (simple FRA for extensions under 250 sqm), and in Surface Water Flood Risk Management Zones.Applies to: all applicationsCity Plan 39, 45; London Plan SI12
Heritage Statement / Heritage Impact AssessmentWhere relevantRequired where heritage assets or their settings are affected; a separate HIA is needed where the Westminster World Heritage Site may be affected.Applies to: all applicationsCity Plan 44; London Plan HC1, HC2
Landscaping / Urban Greening FactorWhere relevantMajors need a UGF assessment; landscaping plans are needed for basements under gardens, new public or private space, or loss of landscaping.Applies to: all applicationsLondon Plan G5, G7; City Plan 38, 48
Lighting AssessmentWhere relevantRequired where external lighting, large illuminated adverts or digital screens are proposed.Applies to: all applicationsCity Plan 37; London Plan D8, G6
Noise Impact AssessmentWhere relevantRequired for external plant, effects on noise-sensitive neighbours, agent-of-change cases, and new sensitive uses in noisy areas.Applies to: all applicationsCity Plan 37; London Plan D13, D14
Planning StatementWhere relevantRequired for all majors and wherever planning obligations are needed; recommended for minor schemes and changes of use.Applies to: major schemes, 2 to 9 homes, one new home, changes of use, commercialCity Plan (general)
BREEAM Pre-AssessmentWhere relevantRequired for non-domestic schemes of 500 sqm GIA+, and conversions/extensions creating 500 sqm+ residential or 5+ units.Applies to: commercial, major schemes, changes of useCity Plan 42; London Plan SI5
Circular Economy StatementWhere relevantRequired for Mayor-referable schemes and where over 50% of a multi-storey building is demolished or deep retrofit (10-50% demolition) is proposed.Applies to: major schemes, commercialCity Plan 41, 43; London Plan SI7
Sustainable Design StatementWhere relevantEvery application creating new floorspace, including householder extensions, must include a sustainable design statement and Retrofit First checklist.Applies to: all applicationsCity Plan 38, 40, 42, 43, 44
Townscape Visual Impact AssessmentWhere relevantRequired where a scheme would significantly affect townscape or strategic views.Applies to: major schemes, commercial, 2 to 9 homesCity Plan 45, 46; London Plan HC2-HC4, D9
Transport Statement/Assessment and Travel PlanWhere relevantRequired where transport impacts are significant; a travel plan is needed for Mayor-referable schemes and some cases such as education uses.Applies to: major schemes, commercial, changes of useCity Plan 28; London Plan T3, T4
Pre-Redevelopment Audit / Retrofit First evidenceWhere relevantWhere over 50% of a multi-storey building's floorspace is demolished, a pre-redevelopment audit and Retrofit First checklist must justify demolition.Applies to: major schemes, commercial, 2 to 9 homesCity Plan 43

OUR SERVICES IN WESTMINSTER

Every report, one coordinated team.

All 54 services are available for sites in Westminster. Prices are starting estimates; we confirm the fee in writing before appointment.

Neighbouring councils

YOUR QUESTIONS ANSWERED

Planning in Westminster: FAQs

Still have a question?

Tell us about the site and we will confirm what Westminster will need and what it should cost.

Make an enquiry
Which reports does Westminster require for a house extension?

Westminster's list adds reports mainly when the site has constraints, such as archaeological priority areas, trees on or near the site, a conservation area, near a listed building, air quality management areas, protected species. Drawings and the forms are always needed. Our application checker lists the reports for your address.

How up to date is Westminster's validation list?

The list we use is "Local List of Planning Application Validation Requirements (WCC Local List of Validation Requirements 2026)", dated July 2026. Councils revise their lists, so we confirm the current version before you commission reports.

Do you cover every part of Westminster?

Yes. We work across the whole of Westminster, including the postcode districts NW1, NW8, SW1A, SW1E, SW1H, SW1P, SW1V, SW1W, SW1X, SW1Y, SW7, W1B, W1C, W1D, W1F, W1G, W1H, W1J, W1K, W1S, W1T, W1U, W1W, W2, W9, W10, WC2A, WC2B, WC2E, WC2H, WC2N, WC2R and areas such as Maida Vale, St John's Wood, Marylebone, Pimlico, Bayswater and Queen's Park.

Where are you based?

Our office is at Unit D New Wave House, 4 Humber Road, London NW2 6DW, and we work on sites across all 32 London boroughs, the City of London and OPDC.

YOUR NEXT STEP

Planning an application in Westminster?

Tell us about the site and what you want to build. We will tell you which reports Westminster is likely to need and what they should cost.

Call 020 8004 4464 or email info@greencodeconsultants.com.

Make an enquiry