PLANNING CONSULTANTS · EALING

Planning consultants in Ealing

We prepare and coordinate the planning case and specialist reports for sites in Ealing covering Acton, Ealing, Hanwell, Southall, Greenford and Perivale. This page sets out what London Borough of Ealing asks for when you apply, with links to the council's own documents.

THE COUNCIL'S DOCUMENTS

What Ealing
judges you against.

Validation list. Full planning application checklist (Ealing Council downloads page 1383) - could not be opened. An application missing a required document can be made invalid, which delays the decision.

Development plan. Ealing Development (Core) Strategy 2026 (adopted, 2012); Ealing Development Management DPD (adopted, 2013); Ealing's new Local Plan 2024-2039 (emerging, Subm).

National policy. The National Planning Policy Framework and, for every London council, the London Plan 2021 sit alongside the local plan.

LOCAL PLANNING POINTS

Things that shape applications in Ealing.

Checked against the council's published policy and guidance. Each point links to its source.

  • Ealing's residential extensions guidance (SPD 4) uses a general limit of 3m deep and 3m high for single-storey rear extensions, with more possible on detached houses or where neighbours are well separated. The guidance is old, so how much weight it now carries should be checked case by case. Source
  • Converting a house to a small HMO needs planning permission across the borough. An Article 4 direction has applied in Perivale since 30 October 2024 and in the rest of the borough since 14 November 2025. Source
  • A new Ealing Local Plan is at examination; the inspectors issued their main-modifications letter in June 2026. Source
  • Selective licensing Designation 2 covers 12 wards from 3 January 2023 to 2 January 2028. Source
  • Article 4 direction: Small HMOs (borough-wide). Changing a house (C3) to a small HMO (C4) needs planning permission, across the borough except Perivale ward and the Old Oak and Park Royal Development Corporation area. Source
  • Article 4 direction: Small HMOs (Perivale ward). Changing a house (C3) to a small HMO (C4) needs planning permission in Perivale ward (immediate direction made 30 October 2024, confirmed 11 April 2025). Source
  • Article 4 direction: Listed buildings. Specified permitted development rights at listed buildings in Ealing (details in the scanned direction). Source
  • 7 further Article 4 directions apply to particular areas or conservation areas. Council list

REPORTS EALING ASKS FOR

Ealing's validation list, report by report.

Which of these your application needs depends on the project and the site. In Ealing, extra reports are triggered most often by a conservation area, a listed building, noisy locations, close neighbours, near a listed building, archaeological priority areas. Enter the address in our application checker to see the list for your site.

ReportLevelWhen it is neededPolicy
Accommodation schedule (HMO)RequiredHMO applications need a schedule of bedroom sizes, occupants per room and occupant-to-facility ratios.Applies to: changes of useLondon Plan D6; Ealing DM DPD 7B
Design and access statementRequiredRequired for all major development as defined in the 2015 Development Management Procedure Order.Applies to: major schemesDMPO 2015 art. 2 / national requirement
Heritage StatementRequiredAny application that may affect a heritage asset (conservation area, listed or locally listed building) needs a heritage statement assessing impact on significance and setting, weighing any harm against public benefits; applications lacking it are treated as invalid.Applies to: all applicationsEaling Generic Conservation Area Management Plan, Principles IV and VI; NPPF
Listed building schedule of works and justificationRequiredWorks to a listed building need a schedule of works, analysis of significance and justification; a structural survey may be requested.Applies to: all applicationsEaling Generic Conservation Area Management Plan
HMO management planRequiredHMO applications are expected to include a management plan covering tenant selection, house rules, anti-social behaviour, maintenance and a 24/7 contact.Applies to: changes of useEaling DM DPD 7A (amenity); London Plan H9
Planning statement (HMO)RequiredHMO applications should include a planning statement showing policy compliance and the local context, including nearby HMOs and site photos. C3 to C4 HMO changes need permission borough-wide under Article 4 from 14 Nov 2025, and in Perivale from 30 Oct 2024.Applies to: changes of useLondon Plan H9; Ealing DM DPD 7A, 7B; Article 4 Directions
Flood risk assessment and/or drainage strategy (with SuDS/Drainage proforma)RequiredEaling says every planning application needs a flood risk assessment and/or a drainage strategy as set out in the West London SFRA, with the SuDS/drainage proforma completed; majors must use SuDS aiming for greenfield run-off.Applies to: all applicationsWest London SFRA; national SuDS arrangements from April 2015
Air Quality AssessmentWhere relevantThe whole borough is an AQMA; an assessment is normally expected where traffic on a busy link (over 10,000 vehicles/day) rises 5%+, commercial/industrial floorspace exceeds 2,500 sqm, 300+ parking spaces are added, or new exposure is introduced where objectives are exceeded.Applies to: major schemes, commercialEaling SPG 3 Air Quality (retained interim guidance, c.2004); London Plan SI 1
Tree survey and arboricultural impact assessmentWhere relevantWhere trees are on or next to the site, full applications should include a BS5837 tree survey, arboricultural impact assessment and retention/removal plan with root protection areas, levels changes and landscape/replacement planting; method statements follow at reserved matters/conditions stage.Applies to: all applicationsBS5837:2012; Ealing SPG 9 Trees and Development (retained interim guidance); TCPA 1990 s197
Archaeological assessmentWhere relevantGround disturbance in an Area of Archaeological Potential, or major development or significant infrastructure works, may need an archaeological assessment (can form part of the heritage statement).Applies to: all applicationsEaling Generic Conservation Area Management Plan
Delivery and Servicing PlanWhere relevantDeliveries and servicing for schemes needing a transport assessment are expected to be managed through a delivery and servicing plan using TfL formats.Applies to: major schemes, commercialEaling Sustainable Transport for New Development SPD (Dec 2013); London Plan T7
Design and access statement (conservation area / listed building)Where relevantIn a conservation area, required where the scheme creates one or more dwellings or at least 100 m2 of floorspace; also required for all listed building consent applications.Applies to: all applicationsDMPO 2015 / national requirement
Energy statementWhere relevantEaling's (older, undated) energy statement guidance says an energy assessment is always expected for new development; large schemes should also assess CHP feasibility.Applies to: one new home, 2 to 9 homes, major schemes, commercialLondon Plan energy hierarchy (guidance cites 2011 numbering 5.2-5.9)
Viability statement (published unredacted)Where relevantWhere viability information is submitted, it must arrive in a form ready for immediate unredacted publication at validation (council policy since 1 March 2019).Applies to: major schemes, 2 to 9 homes, commercialEaling viability publication guidance (2019)
Flood Risk Assessment (site-specific)Where relevantUnder the West London SFRA that Ealing applies, a site-specific FRA is needed in Flood Zones 2/3 (including minor works and changes of use), for sites of 1 ha+ in Zone 1, and where surface water or other flood sources could affect new or more vulnerable uses.Applies to: all applicationsWest London SFRA s.4.3.3; NPPF
Demolition justification (conservation area)Where relevantDemolition in a conservation area (buildings over 115 cubic metres, or walls/fences/railings over the stated heights) needs a statement on condition, character and justification, plus a structural engineer's report if instability is claimed.Applies to: all applicationsEaling Generic Conservation Area Management Plan
Noise statement (HMO)Where relevantNeeded for HMOs where noise impacts are possible, for example in flatted blocks or close terraces, covering room stacking and sound insulation upgrades.Applies to: changes of useLondon Plan D14; Ealing DM DPD 7A
Noise Impact AssessmentWhere relevantNeeded for noise-sensitive uses (homes, schools, hospitals) near roads, railways, aircraft or other noise sources, and for noise-generating uses (bars, takeaways, places of worship, sports, plant) near existing homes.Applies to: one new home, 2 to 9 homes, major schemes, changes of use, commercialEaling SPG 10 Noise and Vibration (retained interim guidance, c.2004); London Plan D14
Statement of Community Involvement / engagement summaryWhere relevantMajor applications should include a concise summary of pre-application community engagement, proportionate to scale and cross-referenced to the council's SCI; estate regeneration must show ongoing resident engagement.Applies to: major schemesEaling LPPG Community engagement and stewardship in major development (Mar 2026)
Stewardship statementWhere relevantMajor schemes that create publicly accessible space or estate-wide management arrangements should include a short statement on long-term management of communal and public spaces.Applies to: major schemesEaling LPPG Community engagement and stewardship in major development (Mar 2026)
Transport statement (proportionate, HMO)Where relevantWhere relevant, HMO schemes should cover PTAL, cycle parking and deliveries, with a parking survey if on-street parking pressure may be an issue.Applies to: changes of useLondon Plan T5, T6; Ealing DM DPD 6.13
Transport AssessmentWhere relevantNeeded for schemes referable to the Mayor and above Ealing guideline sizes (e.g. over 100 homes, offices over about 2,000 sqm, industry/storage over 4,000 sqm, hotels of 100+ beds), or generating over 500 trips a day, 100+ peak-hour trips, 20+ HGVs a day, or 20+ parking spaces.Applies to: major schemes, commercialEaling Sustainable Transport for New Development SPD (Dec 2013); London Plan T4
Residential Travel Plan / Travel Plan StatementWhere relevantA full travel plan is needed for residential schemes over 25 units (and for any scheme needing a transport assessment); smaller or framework-covered schemes provide a travel plan statement.Applies to: 2 to 9 homes, major schemesEaling Sustainable Transport for New Development SPD (Dec 2013); London Plan T4
Workplace Travel Plan / Travel Plan StatementWhere relevantA full workplace travel plan is needed for employment floorspace over 1,000 sqm and for A3-A5 food and drink uses over 750 sqm; a framework plan applies to mixed-use or outline schemes.Applies to: major schemes, commercialEaling Sustainable Transport for New Development SPD (Dec 2013)
Vibration AssessmentWhere relevantDevelopment close to railways is expected to include a vibration assessment.Applies to: one new home, 2 to 9 homes, major schemes, changes of useEaling SPG 10 Noise and Vibration (retained interim guidance)

OUR SERVICES IN EALING

Every report, one coordinated team.

All 54 services are available for sites in Ealing. Prices are starting estimates; we confirm the fee in writing before appointment.

Neighbouring councils

YOUR QUESTIONS ANSWERED

Planning in Ealing: FAQs

Still have a question?

Tell us about the site and we will confirm what Ealing will need and what it should cost.

Make an enquiry
Which reports does Ealing require for a house extension?

Ealing's validation list requires Flood risk assessment and/or drainage strategy (with SuDS/Drainage proforma) for householder applications, before any site constraints are taken into account. Constraints such as a conservation area, flood zone or protected trees add further reports. Our application checker lists them for your address.

How up to date is Ealing's validation list?

The list we use is "Full planning application checklist (Ealing Council downloads page 1383) - could not be opened", which is undated. Councils revise their lists, so we confirm the current version before you commission reports.

Do you cover every part of Ealing?

Yes. We work across the whole of Ealing, including the postcode districts NW10, UB1, UB2, UB5, UB6, UB18, W3, W4, W5, W7, W13 and areas such as Acton, Ealing, Hanwell, Southall, Greenford and Perivale.

Where are you based?

Our office is at Unit D New Wave House, 4 Humber Road, London NW2 6DW, and we work on sites across all 32 London boroughs, the City of London and OPDC.

YOUR NEXT STEP

Planning an application in Ealing?

Tell us about the site and what you want to build. We will tell you which reports Ealing is likely to need and what they should cost.

Call 020 8004 4464 or email info@greencodeconsultants.com.

Make an enquiry