PLANNING CONSULTANTS · OLD OAK AND PARK ROYAL

Planning consultants in Old Oak and Park Royal

The Old Oak and Park Royal Development Corporation is the planning authority for the Old Oak and Park Royal area, which straddles parts of Brent, Ealing and Hammersmith and Fulham. Applications there go to OPDC rather than the borough, with OPDC's own Local Plan and validation list.

THE COUNCIL'S DOCUMENTS

What Old Oak and Park Royal
judges you against.

Validation list. OPDC Validation Checklist 2026 (2026 (consulted 8 May-19 June 2026; adoption recommended in report dated 17 July 2026)). An application missing a required document can be made invalid, which delays the decision.

Development plan. OPDC Local Plan 2018-2038 (adopted, 2022); OPDC Local Plan review (interim timetable published; stages not confirmed) (emerging).

National policy. The National Planning Policy Framework and, for every London council, the London Plan 2021 sit alongside the local plan.

REPORTS OLD OAK AND PARK ROYAL ASKS FOR

Old Oak and Park Royal's validation list, report by report.

Which of these your application needs depends on the project and the site. In Old Oak and Park Royal, extra reports are triggered most often by tall buildings, large sites, a conservation area, a listed building, near a listed building, air quality management areas. Enter the address in our application checker to see the list for your site.

ReportLevelWhen it is neededPolicy
Affordable Housing StatementRequiredRequired for proposals of 10 or more new homes.Applies to: major schemesOPDC Local Plan H2; London Plan H4, H5
Energy Statement (including Overheating Assessment)RequiredRequired for major development, including an overheating assessment.Applies to: major schemesOPDC Local Plan EU9, EU10; London Plan SI2, SI3, SI4
Flood Risk Assessment (basements)RequiredEvery basement extension needs a flood risk assessment, regardless of flood zone.Applies to: basementsOPDC Local Plan EU3
Health Impact AssessmentRequiredRequired for major development.Applies to: major schemesOPDC Local Plan SP3; London Plan GG3
Fire Statement (independent fire strategy)RequiredAll major development needs an independent fire strategy.Applies to: major schemesLondon Plan D12
Planning StatementRequiredMinor schemes need a short statement and majors a full one, covering relocation, catalyst, cultural or meanwhile-use issues where relevant.Applies to: one new home, 2 to 9 homes, major schemes, commercial, changes of use, basementsOPDC Local Plan E2, E5, TCC4, TCC7-TCC9
Site Waste Management PlanRequiredRequired for major development.Applies to: major schemesOPDC Local Plan EU6; London Plan SI7
Statement of Community InvolvementRequiredRequired for major development.Applies to: major schemesOPDC Local Plan DI3
Urban Greening Factor calculationRequiredRequired for major development.Applies to: major schemesOPDC Local Plan EU2; London Plan G5
Affordable Workspace Management StrategyWhere relevantNeeded where new employment floorspace is created.Applies to: commercial, major schemes, changes of useOPDC Local Plan E3; London Plan E3
Air Quality AssessmentWhere relevantRequired for major development, schemes that could cause air pollution, and sensitive uses near pollution sources.Applies to: one new home, 2 to 9 homes, major schemes, commercial, changes of use, basementsOPDC Local Plan EU4; London Plan SI1
Tree Assessment (survey, AIA, AMS, Tree Protection Plan)Where relevantNeeded where works affect TPO or conservation-area trees or other sizeable trees.Applies to: all applicationsLondon Plan G7
Biodiversity Net Gain informationWhere relevantNeeded for minor and major (non-householder) applications subject to the biodiversity gain condition, or evidence that BNG does not apply.Applies to: one new home, 2 to 9 homes, major schemes, commercial, changes of use, basementsTCPA 1990 Sch. 7A
BREEAM Pre-AssessmentWhere relevantNeeded for non-residential schemes creating new commercial units or extensions of 100 sqm+.Applies to: commercial, major schemes, changes of useOPDC Local Plan EU3; London Plan SI2, SI5
Circular Economy StatementWhere relevantRequired for applications referable to the Mayor.Applies to: major schemesOPDC Local Plan EU6-EU8; London Plan SI7
Construction Management PlanWhere relevantRequired for major development involving construction and for any application that would obstruct the public highway.Applies to: major schemes, 2 to 9 homes, one new home, commercial, basementsOPDC Local Plan T8; London Plan T7
Preliminary Risk Assessment (land contamination)Where relevantNeeded on or near known or suspected contaminated land, or where sensitive uses are proposed.Applies to: one new home, 2 to 9 homes, major schemes, commercial, changes of use, basementsOPDC Local Plan EU13
Daylight and Sunlight AssessmentWhere relevantNeeded for major development that could affect light to sensitive neighbouring uses.Applies to: major schemesOPDC Local Plan D5
Delivery and Servicing PlanWhere relevantNeeded for any development requiring commercial or residential servicing.Applies to: major schemes, commercial, changes of use, 2 to 9 homesOPDC Local Plan T7; London Plan T7
Design and Access StatementWhere relevantRequired for major development and listed building consent, and in a conservation area for one or more dwellings or 100 sqm+ of floorspace.Applies to: all applicationsDMPO 2015 (national)
Draft Heads of Terms (planning obligations)Where relevantNeeded where a legal agreement will be required.Applies to: major schemes, 2 to 9 homes, commercialOPDC Planning Obligations SPD
Biodiversity / Ecology Assessment (incl. Preliminary Ecological Appraisal)Where relevantRequired for major development, sites in or next to a SINC or Local Nature Reserve, or where protected species could be affected.Applies to: all applicationsOPDC Local Plan EU2; London Plan G6
Financial Viability AppraisalWhere relevantNeeded where policy requires viability evidence on affordable housing (e.g. below threshold levels).Applies to: major schemesOPDC Local Plan H2; London Plan H5
Fire Statement (national form)Where relevantNeeded for buildings 18 m+ or 7+ storeys containing two or more homes or educational accommodation, including works in their curtilage.Applies to: 2 to 9 homes, major schemes, one new home, changes of useDMPO 2015 Art. 9A
Flood Risk AssessmentWhere relevantNeeded in Flood Zones 2/3 (including minor works and changes of use), on sites over 1 ha, for majors in Critical Drainage Areas, and for all basements.Applies to: all applicationsOPDC Local Plan EU3; London Plan SI12
Archaeological Desk-based AssessmentWhere relevantNeeded where development could affect archaeological heritage assets (OPDC notes there are no Archaeological Priority Areas in its area).Applies to: one new home, 2 to 9 homes, major schemes, commercial, changes of use, basementsOPDC Local Plan D7; London Plan HC1
Heritage StatementWhere relevantNeeded where a proposal could affect a heritage asset or its setting.Applies to: all applicationsOPDC Local Plan D7; London Plan HC1
Landscape StrategyWhere relevantRequired for major development and minor schemes with significant landscaping.Applies to: major schemes, 2 to 9 homes, one new home, commercialOPDC Local Plan D1; London Plan D8
Marketing StrategyWhere relevantNeeded where employment space (outside SIL), town centre uses, social infrastructure, cultural space or pubs would be lost, with 12 months' marketing (24 for pubs).Applies to: changes of use, major schemes, commercial, 2 to 9 homes, one new homeOPDC Local Plan E2, TCC2-TCC6; London Plan E7, HC7
Microclimate Impact AssessmentWhere relevantNeeded for new buildings or extensions over 30 m high; wind tunnel testing is normally expected.Applies to: major schemes, commercialOPDC Local Plan D5
Noise and Vibration Impact AssessmentWhere relevantNeeded for homes or other sensitive uses near noise sources, noisy uses, and new plant, flues or extraction.Applies to: one new home, 2 to 9 homes, major schemes, commercial, changes of use, basementsOPDC Local Plan EU5; London Plan D14
Open Space AssessmentWhere relevantRequired for major development and where public open space is created.Applies to: major schemesOPDC Local Plan EU1
Parking Design and Management PlanWhere relevantRequired for major development and any scheme with on-site car parking (including Blue Badge or car club bays).Applies to: major schemes, 2 to 9 homes, one new home, commercial, changes of useOPDC Local Plan T4; London Plan T6
Residential Management PlanWhere relevantNeeded for supported/specialist housing, student housing, large-scale shared living and build-to-rent.Applies to: major schemes, changes of useOPDC Local Plan H6, H7, H9, H10; London Plan H12-H16
SuDS, Drainage and Water Efficiency Strategy (with SuDS pro-forma)Where relevantNeeded for any development creating new buildings or increasing impermeable area; water efficiency also for all majors.Applies to: one new home, 2 to 9 homes, major schemes, commercial, basements, house extensionsOPDC Local Plan EU3; London Plan SI5, SI13
Town Centre Uses Statement (sequential and impact tests)Where relevantNeeded for town centre uses proposed outside a designated town centre.Applies to: commercial, changes of use, major schemesOPDC Local Plan TCC1; London Plan SD7
Tall Building StatementWhere relevantNeeded for tall buildings over 15 storeys or 48 m.Applies to: major schemes, commercialOPDC Local Plan D4; London Plan D9
Townscape and Visual Impact AssessmentWhere relevantNeeded where key views are affected, for tall buildings, and for demolition or development affecting a conservation area or listed building.Applies to: major schemes, commercial, 2 to 9 homesOPDC Local Plan D4, D6; London Plan D9
Transport Statement / Transport AssessmentWhere relevantRequired for major development and any scheme with significant transport implications.Applies to: major schemes, commercial, changes of use, 2 to 9 homesOPDC Local Plan T9; London Plan T4
Travel PlanWhere relevantRequired for major development and any scheme with significant transport implications.Applies to: major schemes, commercial, changes of useOPDC Local Plan T9; London Plan T4
Whole Life-Cycle Carbon AssessmentWhere relevantRequired (within the circular economy submission) for Mayor-referable major applications.Applies to: major schemesLondon Plan SI2

OUR SERVICES IN OLD OAK AND PARK ROYAL

Every report, one coordinated team.

All 54 services are available for sites in Old Oak and Park Royal. Prices are starting estimates; we confirm the fee in writing before appointment.

Neighbouring councils

YOUR QUESTIONS ANSWERED

Planning in Old Oak and Park Royal: FAQs

Still have a question?

Tell us about the site and we will confirm what Old Oak and Park Royal will need and what it should cost.

Make an enquiry
Which reports does Old Oak and Park Royal require for a house extension?

Old Oak and Park Royal's list adds reports mainly when the site has constraints, such as tall buildings, large sites, a conservation area, a listed building, near a listed building, air quality management areas. Drawings and the forms are always needed. Our application checker lists the reports for your address.

How up to date is Old Oak and Park Royal's validation list?

The list we use is "OPDC Validation Checklist 2026", dated 2026 (consulted 8 May-19 June 2026; adoption recommended in report dated 17 July 2026). Councils revise their lists, so we confirm the current version before you commission reports.

Where are you based?

Our office is at Unit D New Wave House, 4 Humber Road, London NW2 6DW, and we work on sites across all 32 London boroughs, the City of London and OPDC.

YOUR NEXT STEP

Planning an application in Old Oak and Park Royal?

Tell us about the site and what you want to build. We will tell you which reports Old Oak and Park Royal is likely to need and what they should cost.

Call 020 8004 4464 or email info@greencodeconsultants.com.

Make an enquiry