PLANNING CONSULTANTS · CROYDON

Planning consultants in Croydon

We prepare and coordinate the planning case and specialist reports for sites in Croydon covering Thornton Heath, South Norwood, Norbury, Addiscombe, Purley and Coulsdon. This page sets out what London Borough of Croydon asks for when you apply, with links to the council's own documents.

THE COUNCIL'S DOCUMENTS

What Croydon
judges you against.

Validation list. Local Validation List: Guidance on Submitting a Valid Planning Application (May 2026). An application missing a required document can be made invalid, which delays the decision.

Development plan. Croydon Local Plan 2018 (adopted, 2018); Croydon Local Plan Review (to 2040) (emerging, Subm).

National policy. The National Planning Policy Framework and, for every London council, the London Plan 2021 sit alongside the local plan.

LOCAL PLANNING POINTS

Things that shape applications in Croydon.

Checked against the council's published policy and guidance. Each point links to its source.

  • The Suburban Design Guide SPD (SPD2, 2019) was revoked and has not been used to decide planning applications since 26 July 2022, so extensions are assessed against Local Plan policy rather than its design rules. Source
  • A borough-wide Article 4 direction has removed permitted development rights for converting a house or flat to a small HMO since 28 January 2020, so this change of use needs planning permission. Source
  • There are 21 conservation areas in Croydon. Source
  • New licensing schemes started on 1 September 2026 for five years: selective licensing in 14 of the borough's 28 wards and additional HMO licensing across the whole borough. Source
  • A partial review of the Croydon Local Plan (2018) was submitted for examination on 29 November 2024; hearings ended in October 2025 and further main modifications are to go to public consultation. Source
  • Article 4 direction: Houses in multiple occupation. Converting a house into a small HMO (C3 to C4) needs planning permission, across the whole borough. Source
  • 7 further Article 4 directions apply to particular areas or conservation areas. Council list

REPORTS CROYDON ASKS FOR

Croydon's validation list, report by report.

Which of these your application needs depends on the project and the site. In Croydon, extra reports are triggered most often by protected species, flood zones 2 and 3, flood3, critical drainage areas, nature conservation sites, land with a previous industrial use. Enter the address in our application checker to see the list for your site.

ReportLevelWhen it is neededPolicy
Air Quality AssessmentRequiredRequired for all major schemes, since the whole borough is an Air Quality Management Area; off-site mitigation contributions may follow.Applies to: major schemesCLP18 DM16, DM23; LP21 SI 1
Biodiversity Statement / BNG StatementRequiredEvery application must say whether the BNG condition applies. Exempt schemes give an exemption statement; others need an ecologist's BNG statement with the statutory metric and habitat plan, plus a fuller BNG assessment where more than 25 m2 of vegetation is affected.Applies to: all applicationsCLP18 DM27; LP21 G6; Environment Act BNG regime
Daylight / Sunlight AssessmentRequiredRequired for major schemes using BRE methods, with results tables supplied in editable form.Applies to: major schemesCLP18 DM10.6; LP21 D6, D9
Inclusive Design StatementRequiredRequired for minor applications and above.Applies to: one new home, 2 to 9 homes, major schemes, commercial, changes of useCLP18 DM10, DM13; LP21 D5, D7
Energy AssessmentRequiredMajor schemes must show how they reach net zero carbon, including any carbon offset payment calculation.Applies to: major schemesCLP18 SP6; LP21 SI 2-SI 4
Energy Design StatementRequiredMinor residential schemes must explain their clean energy approach and its amenity impacts.Applies to: one new home, 2 to 9 homesCLP18 SP6
Fire Statement or Reasonable Exception StatementRequiredAll applications need a fire statement or a reasonable exception statement; a full statement is needed for relevant buildings (2+ dwellings or educational use and 18 m+ or 7+ storeys).Applies to: all applicationsLP21 D12; London Plan Fire Safety LPG
Flood Risk AssessmentRequiredEvery application needs an FRA proportionate to the scheme, even outside flood risk areas; for householder extensions a brief statement with a flood map search may be enough.Applies to: all applicationsCLP18 SP6, DM25; LP21 SI 12, SI 13
Health Impact AssessmentRequiredMajor schemes need at least a completed HUDU Healthy Urban Planning Checklist.Applies to: major schemesCLP18 DM16; LP21 GG3
Housing Quality StatementRequiredAll residential schemes must show compliance with unit mix, space standards and amenity space requirements.Applies to: one new home, 2 to 9 homes, major schemes, changes of useCLP18 SP2, DM1, DM10; LP21 D6
Planning StatementRequiredRequired for minor applications and above.Applies to: one new home, 2 to 9 homes, major schemes, commercial, changes of useLP21 DF1
Transport Statement (Minors) / Transport Assessment (Majors)RequiredMinor schemes need a transport statement and majors a full transport assessment, covering parking, sight lines, swept paths and parking stress surveys where relevant.Applies to: one new home, 2 to 9 homes, major schemes, commercial, changes of useCLP18 SP8, DM29, DM30; LP21 T4-T6
Draft Travel Plan / Delivery and Servicing PlanRequiredMajor schemes must submit a draft travel plan and a draft delivery and servicing plan.Applies to: major schemesCLP18 SP8, DM29; LP21 T4
Urban Greening Factor AssessmentRequiredRequired for all major schemes.Applies to: major schemesLP21 G5
Tree Survey / Arboricultural Report (BS5837)Where relevantRequired wherever trees stand on or next to the site.Applies to: all applicationsCLP18 DM10, DM28; LP21 G7
Archaeological AssessmentWhere relevantRequired for major schemes inside an Archaeological Priority Area, or on sites over 0.5 ha.Applies to: major schemesCLP18 SP4, DM18; LP21 HC1
Construction Management / Logistics Plan scoping noteWhere relevantRequired for Large Minors (5+ homes or 500 m2+) and above, and may be asked for on smaller schemes.Applies to: 2 to 9 homes, major schemes, commercialCLP18 DM23, DM29; LP21 T4, T7
Contaminated Land AssessmentWhere relevantRequired for major schemes on sites with a history of potentially polluting uses.Applies to: major schemesCLP18 DM24; LP21 SD1, E7
Design and Access StatementWhere relevantNeeded for 100 m2+ of floorspace, for one or more homes in a conservation area, for listed building consent, and for all Large Minors and above.Applies to: all applicationsCLP18 DM10
Preliminary Ecological AssessmentWhere relevantRequired for Large Minors (5+ homes or 500 m2+ floorspace) and all majors.Applies to: 2 to 9 homes, major schemes, commercialCLP18 DM27, SP7; LP21 G6; NERC Act s40
Preliminary Ecological Assessment (designated sites)Where relevantAny application on a site in or next to a SINC, SSSI, NNR or LNR needs a PEA, whatever its size.Applies to: all applicationsCLP18 DM27, SP7; LP21 G6; NERC Act s40
Preliminary Roost Assessment (Bats)Where relevantRequired for demolition, conversion of a vacant building, or works affecting features that could host roosting bats.Applies to: all applicationsCLP18 DM27; LP21 G6
Economic / Employment AssessmentWhere relevantRequired where employment land or floorspace would be lost, with marketing evidence.Applies to: changes of use, commercial, major schemesCLP18 SP3; LP21 E4-E6
Financial Viability Assessment / Affordable Housing StatementWhere relevantMajor residential schemes need an affordable housing statement, plus a viability assessment when they do not meet the Fast Track criteria.Applies to: major schemesCLP18 SP2, DM1; LP21 H4-H8
Basement Impact Assessment (within FRA)Where relevantBasements proposed in areas at risk of groundwater flooding must include a basement impact assessment in the FRA covering aquifers, drainage and flood mitigation for the site and neighbours.Applies to: basementsCLP18 DM25; LP21 SI 12
Heritage StatementWhere relevantRequired where development affects a heritage asset or its setting; a structural survey is also needed if demolition is proposed.Applies to: all applicationsCLP18 SP4, DM15, DM18; LP21 HC1
Noise and Vibration Impact AssessmentWhere relevantRequired for all majors, and for minor schemes that introduce noisy uses or place noise-sensitive uses near noise sources; majors must use a qualified acoustician.Applies to: major schemes, commercial, changes of use, one new home, 2 to 9 homesCLP18 DM10, DM23; LP21 D13, D14
Original and Proposed Floorspace Calculation (Green Belt / MOL)Where relevantExtensions in the Green Belt or on Metropolitan Open Land must show original and proposed floorspace and volume.Applies to: all applicationsCLP18 DM26
Drainage StrategyWhere relevantRequired for Large Minors (5+ homes or 500 m2+) and above, showing SuDS that follow the drainage hierarchy.Applies to: 2 to 9 homes, major schemes, commercialCLP18 SP6, DM25; LP21 SI 13
Townscape and Visual Impact Assessment / Microclimate Wind Assessment (tall buildings)Where relevantTall buildings need a TVIA, a wind microclimate study (wind tunnel testing expected) and a TV/radio reception assessment.Applies to: major schemes, commercialCLP18 DM10, DM15; LP21 D9, HC1
Ventilation / Extraction StatementWhere relevantNon-residential minor schemes with plant, ventilation or kitchen extraction must describe the equipment.Applies to: commercial, changes of useCLP18 SP6, DM10, DM23
Circular Economy Statement and Whole Life-Cycle Carbon AssessmentWhere relevantRequired only for major schemes that must be referred to the Mayor of London.Applies to: major schemesLP21 SI 2F, SI 7, D3

OUR SERVICES IN CROYDON

Every report, one coordinated team.

All 54 services are available for sites in Croydon. Prices are starting estimates; we confirm the fee in writing before appointment.

OUR WORK IN CROYDON

Applications we have supported here.

Neighbouring councils

YOUR QUESTIONS ANSWERED

Planning in Croydon: FAQs

Still have a question?

Tell us about the site and we will confirm what Croydon will need and what it should cost.

Make an enquiry
Which reports does Croydon require for a house extension?

Croydon's validation list requires Biodiversity Statement / BNG Statement, Fire Statement or Reasonable Exception Statement, Flood Risk Assessment for householder applications, before any site constraints are taken into account. Constraints such as a conservation area, flood zone or protected trees add further reports. Our application checker lists them for your address.

How up to date is Croydon's validation list?

The list we use is "Local Validation List: Guidance on Submitting a Valid Planning Application", dated May 2026. Councils revise their lists, so we confirm the current version before you commission reports.

Do you cover every part of Croydon?

Yes. We work across the whole of Croydon, including the postcode districts CR0, CR2, CR3, CR5, CR7, CR8, CR9, CR90, SE19, SE25, SW16 and areas such as Thornton Heath, South Norwood, Norbury, Addiscombe, Purley and Coulsdon.

Where are you based?

Our office is at Unit D New Wave House, 4 Humber Road, London NW2 6DW, and we work on sites across all 32 London boroughs, the City of London and OPDC.

YOUR NEXT STEP

Planning an application in Croydon?

Tell us about the site and what you want to build. We will tell you which reports Croydon is likely to need and what they should cost.

Call 020 8004 4464 or email info@greencodeconsultants.com.

Make an enquiry